共 50 条
- [41] Research on Performance of Gas-Steam Combined Cycle Waste Heat Recovery System [J]. Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 2021, 42 (04): : 854 - 864
- [42] Recovery of Waste Heat from Generator into the Water Preheating Circuit, at Steam Thermal Power Plants [J]. 2015 9TH INTERNATIONAL SYMPOSIUM ON ADVANCED TOPICS IN ELECTRICAL ENGINEERING (ATEE), 2015, : 603 - 608
- [43] Water/steam cycle chemistry in combined-cycle power plants [J]. VGB PowerTech, 1998, 78 (12): : 60 - 65
- [44] Combined heat and power dispatching model based on gas-steam combined cycle unit [J]. Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2019, 47 (08): : 137 - 144
- [47] STEAM GENERATORS FOR COMBINED STEAM AND GAS TURBINE PLANTS [J]. JOURNAL OF ENGINEERING FOR POWER, 1966, 88 (04): : 402 - &
- [48] STEAM GENERATORS FOR COMBINED STEAM AND GAS TURBINE PLANTS [J]. MECHANICAL ENGINEERING, 1966, 88 (05): : 151 - &
- [49] SIMPLIFY HEAT-RECOVERY STEAM-GENERATOR EVALUATION [J]. HYDROCARBON PROCESSING, 1990, 69 (03): : 77 - 82