共 50 条
- [31] Study on zone failure characteristics of top-coal in fully-mechanized top-coal caving mining of thick coal seam [J]. Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (07): : 99 - 107
- [32] Study on home equipment matching in fully mechanized top-coal caving in super-length wall face [J]. 2000, China Coal Soc, China (25):
- [33] Characteristics of Mining Floor Deformation and Failure for Fully Mechanized Top Coal Caving Face in Chaohua Coal Mine [J]. 2010 INTERNATIONAL CONFERENCE ON MINE HAZARDS PREVENTION AND CONTROL, 2010, 12 : 481 - +
- [34] Study on the rational width of coal pillars for protecting roadway in fully mechanized top caving mining face [J]. ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 719 - 730
- [35] Analyzing on air-leakage condition of gate in fully-mechanized long-wall top-coal caving mining face [J]. Meitan Xuebao/Journal of China Coal Society, 2000, 25 (06): : 619 - 623
- [36] Numerical simulation study on roof stability of face area in fully mechanized mining with top coal caving [J]. Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2000, 19 (04): : 472 - 475
- [37] Research on instability of the triangular coal alongside the goaf in a fully mechanized top-coal caving work face [J]. Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2011, 40 (05): : 678 - 683
- [38] Design of coal pillar with roadway driving along goaf in fully mechanized top-coal caving face [J]. MINE SAFETY AND EFFICIENT EXPLOITATION FACING CHALLENGES OF THE 21ST CENTURY, 2010, : 235 - 241
- [39] Study on distribution law of lead abutment pressure in fully mechanized caving face with large mining height [J]. PROGRESS IN MINE SAFETY SCIENCE AND ENGINEERING II, 2014, : 389 - 394