Lot sizing with a Markov production process and imperfect items scrapped

被引:21
|
作者
Maddah, Bacel [1 ]
Moussawi, Lama [2 ]
Jaber, Mohamad Y. [3 ]
机构
[1] Amer Univ Beirut, Engn Management Program, Beirut 11072020, Lebanon
[2] Amer Univ Beirut, Olayan Sch Business, Beirut 11072020, Lebanon
[3] Ryerson Univ, Dept Mech & Ind Engn, Toronto, ON M5B 2K3, Canada
关键词
Imperfect quality; Random yield; Lot sizing; EOQ; PRODUCTION QUANTITY MODEL; SETUP COST REDUCTION; QUALITY; INVENTORY; IMPROVEMENT;
D O I
10.1016/j.ijpe.2009.11.029
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers an inventory system within the economic order quantity (EOQ) model framework under random supply. The production process can go "out-of-control" with a constant probability and start producing imperfect quality items. Such a system has been studied in the literature under the assumption that defective items are reworked instantaneously and returned to inventory. In some situations, imperfect quality items are not necessarily defective and are removed from the inventory to be used elsewhere. This paper develops two models where imperfect items are removed from inventory. The first model finds the expected cost and optimal lot size assuming that imperfect quality items are removed from inventory at no cost. The second model assumes that batches of imperfect quality are consolidated and shipped together due to economies of scale in shipping. Analytical and numerical results are developed for both models revealing several managerial insights. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:340 / 347
页数:8
相关论文
共 50 条
  • [31] Optimal pricing, lot-sizing and marketing planning in a capacitated and imperfect production system
    Sadjadi, Seyed Jafar
    Yazdian, Seyed Ahmad
    Shahanaghi, Kamran
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) : 349 - 358
  • [32] Optimal lot sizing for deteriorating items with expiration date
    Hsu, Ping-Hui
    Wee, Hui Ming
    Teng, Hui-Ming
    [J]. JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2006, 27 (02): : 271 - 286
  • [33] COMBINING ITEMS FOR LOT SIZING IN MULTILEVEL ASSEMBLY SYSTEMS
    AXSATER, S
    NUTTLE, HLW
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (06) : 795 - 807
  • [34] LOT-SIZING AND TESTING FOR ITEMS WITH UNCERTAIN QUALITY
    DJAMALUDIN, I
    WILSON, RJ
    MURTHY, DNP
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 1995, 22 (10-12) : 35 - 44
  • [35] Lot-Sizing and Sequencing on a Single Imperfect Machine
    Dolgui, Alexandre
    Kovalyov, Mikhail Y.
    Shchamialiova, Kseniya
    [J]. MODELLING, COMPUTATION AND OPTIMIZATION IN INFORMATION SYSTEMS AND MANAGEMENT SCIENCES, PROCEEDINGS, 2008, 14 : 117 - 125
  • [36] Economic Production Quantity model with scrapped items and limited production capacity
    Taleizadeh, A.
    Najafi, A.A.
    Akhavan Niaki, S.T.
    [J]. Scientia Iranica, 2010, 17 (1 E) : 58 - 69
  • [37] Optimal production lot-sizing and condition-based maintenance policy considering imperfect manufacturing process and inspection errors
    Zhang, Nan
    Tian, Sen
    Xu, Jiatao
    Deng, Yingjun
    Cai, Kaiquan
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 177
  • [38] EPQ MODELS WITH A PRODUCTION RATE PROPORTIONAL TO THE POWER DEMAND RATE, REWORK PROCESS AND SCRAPPED ITEMS
    Keshavarzfard, Razieh
    Makui, Ahmad
    Tavakkoli-Moghaddam, Reza
    Taleizadeh, Ata Allah
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2019, 26 (02): : 173 - 198
  • [39] Economic Production Quantity Model with Scrapped Items and Limited Production Capacity
    Taleizadeh, A.
    Najafi, A. A.
    Niaki, S. T. Akhavan
    [J]. SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2010, 17 (01): : 58 - 69
  • [40] Optimal production lot sizing for an imperfect manufacturing system with machine breakdown and emergency maintenance policy
    Lai, Xinfeng
    Chen, Zhixiang
    Sarker, Bhaba R.
    [J]. KYBERNETES, 2020, 49 (05) : 1533 - 1560