An inexact two-stage mixed integer linear programming model for waste management under uncertainty

被引:32
|
作者
Maqsood, I
Huang, GH [1 ]
Zeng, GM
机构
[1] Univ Regina, Fac Engn, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] Hunan Univ, Sino Canada Ctr Energy & Environm Res, Changsha, Peoples R China
[3] Chinese Acad Sci, Inst Geog Sci & Nat Resources, Beijing, Peoples R China
基金
加拿大自然科学与工程研究理事会;
关键词
decision-making; integer programming; management; solid waste; stochastic programming; uncertainty;
D O I
10.1080/10286600410001730698
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper introduces a hybrid optimization approach, an inexact two-stage mixed integer linear programming (ITMILP) model, for the planning of regional solid waste management systems under uncertainty. The model improves upon the existing mixed integer, two-stage stochastic and interval-parameter programming approaches by allowing uncertainties presented as random distributions and discrete intervals, as well as policies expressed as allowable waste-loading targets to be effectively incorporated within a general optimization framework. In the modeling formulation, penalties are imposed when the policies are violated. In its solutions algorithm, the ITMILP model is transformed into two deterministic submodels, which were solved sequentially. Application of the developed methodology to the planning of a waste management system indicates that reasonable solutions for the binary and continuous decision variables can be generated through this approach. Considerable information was generated regarding decisions of facility expansion within a multi-period, multi-scale and multi-waste-level context; and optimal waste flow allocation patterns were achieved within the waste management system. The ITMILP model was then employed to generate a number of decision alternatives under various policy conditions, allowing for more in-depth analyses of tradeoffs between environmental and economic objectives.
引用
收藏
页码:187 / 206
页数:20
相关论文
共 50 条
  • [21] Fuzzy two-stage quadratic programming for planning solid waste management under uncertainty
    Li, Y. P.
    Huang, G. H.
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2007, 38 (03) : 219 - 233
  • [22] An inexact fuzzy parameter two-stage stochastic programming model for irrigation water allocation under uncertainty
    Li, M.
    Guo, P.
    Fang, S. Q.
    Zhang, L. D.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2013, 27 (06) : 1441 - 1452
  • [23] An Inexact Mix-Integer Two-Stage Linear Programming Model for Supporting the Management of a Low-Carbon Energy System in China
    Liu, Ye
    Huang, Guohe
    Cai, Yanpeng
    Dong, Cong
    [J]. ENERGIES, 2011, 4 (10) : 1657 - 1686
  • [24] An inexact fuzzy parameter two-stage stochastic programming model for irrigation water allocation under uncertainty
    M. Li
    P. Guo
    S. Q. Fang
    L. D. Zhang
    [J]. Stochastic Environmental Research and Risk Assessment, 2013, 27 : 1441 - 1452
  • [25] An Inexact Two-Stage Water Resources Allocation Model for Sustainable Development and Management Under Uncertainty
    L. Zhang
    C. Y. Li
    [J]. Water Resources Management, 2014, 28 : 3161 - 3178
  • [26] Inexact Two-Stage Stochastic Robust Optimization Model for Water Resources Management Under Uncertainty
    Xu, Ye
    Huang, Guohe
    Qin, Xiaosheng
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2009, 26 (12) : 1765 - 1776
  • [27] An Inexact Two-Stage Water Resources Allocation Model for Sustainable Development and Management Under Uncertainty
    Zhang, L.
    Li, C. Y.
    [J]. WATER RESOURCES MANAGEMENT, 2014, 28 (10) : 3161 - 3178
  • [28] A Review on the Performance of Linear and Mixed Integer Two-Stage Stochastic Programming Software
    Torres, Juan J.
    Li, Can
    Apap, Robert M.
    Grossmann, Ignacio E.
    [J]. ALGORITHMS, 2022, 15 (04)
  • [29] An inexact fuzzy-chance-constrained two-stage mixed-integer linear programming approach for flood diversion planning under multiple uncertainties
    Guo, P.
    Huang, G. H.
    Li, Y. P.
    [J]. ADVANCES IN WATER RESOURCES, 2010, 33 (01) : 81 - 91
  • [30] An Inexact Fuzzy-robust Two-stage Programming Model for Managing Sulfur Dioxide Abatement Under Uncertainty
    Y. P. Li
    G. H. Huang
    X. H. Nie
    S. L. Nie
    [J]. Environmental Modeling & Assessment, 2008, 13 : 77 - 91