IFRP: A hybrid interval-parameter fuzzy robust programming approach for waste management planning under uncertainty

被引:142
|
作者
Nie, X. H.
Huang, G. H. [1 ]
Li, Y. P.
Liu, L.
机构
[1] N China Elect Power Univ, Sino Canada Ctr Energy & Environm Res, Beijing 102206, Peoples R China
[2] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
[3] Dalhousie Univ, Dept Civil Engn, Halifax, NS B3J 1Z1, Canada
关键词
decision support; environment; fuzzy; interval; management; optimization; robust; solid waste; uncertainty;
D O I
10.1016/j.jenvman.2006.04.006
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this study, an interval-parameter fuzzy-robust programming (IFRP) model is developed and applied to the planning of solid waste management systems under uncertainty. As an extension of the existing fuzzy-robust programming and interval-parameter linear programming methods, the IFRP can explicitly address system uncertainties with complex presentations. Parameters in the IFRP model can be represented as interval numbers and/or fuzzy membership functions, such that the uncertainties can be directly communicated into the optimization process and resulting solution. Furthermore, highly uncertain information for the lower and upper bounds of interval parameters that exist due to the complexity of the real world can be effectively handled through introducing the concept of fuzzy boundary interval. Consequently, robustness of the optimization process and solution can be enhanced. Results of the case study indicate that useful solutions for planning municipal solid waste management practices can be generated. They reflect a compromise between optimality and stability of the study system. Willingness to pay higher costs will guarantee the system stability; however, a desire to reduce the costs will run the risk of potential instability of the system. The results also suggest that the proposed hybrid methodology is applicable to practical problems that are associated with highly complex and uncertain information. © 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [1] An interval-parameter fuzzy-stochastic programming approach for municipal solid waste management and planning
    Huang, GH
    Sae-Lim, N
    Liu, L
    Chen, Z
    [J]. ENVIRONMENTAL MODELING & ASSESSMENT, 2001, 6 (04) : 271 - 283
  • [2] An Interval-Parameter Fuzzy-Stochastic Programming Approach for Municipal Solid Waste Management and Planning
    G.H. Huang
    N. Sae-Lim
    L. Liu
    Z. Chen
    [J]. Environmental Modeling & Assessment, 2001, 6 : 271 - 283
  • [3] An interval-parameter fuzzy-stochastic programming approach for air quality management under uncertainty
    Lu, Hong-wei
    Huang, Guohe H.
    Liu, Lei
    He, Li
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2008, 25 (06) : 895 - 909
  • [4] Interval-parameter robust quadratic programming for water quality management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Mo, D. W.
    [J]. ENGINEERING OPTIMIZATION, 2008, 40 (07) : 613 - 635
  • [5] An interval-parameter minimax regret programming approach for power management systems planning under uncertainty
    Dong, C.
    Huang, G. H.
    Cai, Y. P.
    Xu, Y.
    [J]. APPLIED ENERGY, 2011, 88 (08) : 2835 - 2845
  • [6] Interval-parameter robust optimization for environmental management under uncertainty
    Li, Y. P.
    Huang, G. H.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (04) : 592 - 606
  • [7] Municipal solid waste management under uncertainty: A mixed interval parameter fuzzy-stochastic robust programming approach
    Cai, Yanpeng
    Huang, G. H.
    Nie, X. H.
    Li, Y. P.
    Tan, Q.
    [J]. ENVIRONMENTAL ENGINEERING SCIENCE, 2007, 24 (03) : 338 - 352
  • [8] Urban Vehicle Emissions Management under Uncertainty - A Traffic Planning Model with Interval-Parameter Programming
    Zhang, Hongliang
    [J]. ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 864-867 : 1586 - 1591
  • [9] An interval-parameter chance-constrained dynamic programming approach for capacity planning under uncertainty
    Dai, C.
    Li, Y. P.
    Huang, G. H.
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2012, 62 : 37 - 50
  • [10] An interval-parameter mean-CVaR two-stage stochastic programming approach for waste management under uncertainty
    Dai, C.
    Cai, X. H.
    Cai, Y. P.
    Huo, Q.
    Lv, Y.
    Huang, G. H.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (02) : 167 - 187