Cost/benefit analysis for building core sunlighting systems

被引:6
|
作者
Mayhoub, M. S. [1 ]
Papamichael, Konstantinos [2 ]
机构
[1] Al Azhar Univ, Fac Engn, Dept Architecture, Nasr City Campus, Cairo, Egypt
[2] Univ Calif Davis, Dept Environm Design, Davis, CA USA
关键词
Core sunlighting systems; Costs; Benefits; Payback period; CYCLE COST-ANALYSIS; PERFORMANCE; DUST;
D O I
10.1016/j.enbuild.2016.02.027
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The economic efficiency of building core sunlighting systems (BCSS) that are used to deliver sunlight into building core is essential for their widespread use. This study analyses the costs and benefits of using the BCSS through a parametric evaluation process considering key parameters, such as installed and saved lighting power, electricity costs, BCSS initial costs and cleaning costs. The latest seems to be a very influential parameter. Values higher than $2/m(2) are not expected to result in a positive return of investment in the installation of the BCSS. Economic performance matrices have been generated to provide parametric tools, by which the economic performance conditions can be easily estimated. They show a wide spectrum of scenarios includes best-case and worst-case scenarios. In the worst-case, the BCSS cannot payback the investment. Meanwhile, in the best-case, a payback period of about 4 years is achieved, which is equivalent to about 81% saving of the electric lighting system electricity costs throughout the BCSS lifespan. This can be translated into $0.56 savings for each kWh of installed electricity power throughout the BCSS lifespan. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:37 / 45
页数:9
相关论文
共 50 条
  • [31] SYSTEMS APPROACH TO COST-BENEFIT ANALYSIS OF URBAN TRANSPORTATION
    SASTRY, MVR
    [J]. TRANSPORTATION JOURNAL, 1973, 12 (03) : 39 - 45
  • [32] Cost benefit analysis of series systems with warm standby components
    Kuo-Hsiung Wang
    Wen-Lea Pearn
    [J]. Mathematical Methods of Operations Research, 2003, 58 : 247 - 258
  • [33] Problems associated with cost/benefit analysis for strategic information systems
    Stickel, E
    [J]. SYSTEMS DEVELOPMENT METHODS FOR THE NEXT CENTURY, 1997, : 101 - 114
  • [34] Cost-benefit analysis of electric taxi systems for aircraft
    Hospodka, Jakub
    [J]. JOURNAL OF AIR TRANSPORT MANAGEMENT, 2014, 39 : 81 - 88
  • [35] Cost benefit analysis of series systems with warm standby components
    Wang, KH
    Pearn, WL
    [J]. MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2003, 58 (02) : 247 - 258
  • [36] COST-BENEFIT-ANALYSIS OF SYSTEMS SUBJECT TO INSPECTION AND REPAIR
    GOPALAN, MN
    [J]. STOCHASTIC PROCESSES AND THEIR APPLICATIONS, 1984, 17 (01) : 44 - 44
  • [37] Cost Benefit Analysis of Wind Turbines in Smart Grid Systems
    Colak, Ilhami
    Ayaz, Melike Selcen
    Bilgili, Muhittin
    Boran, Kurtulus
    [J]. 2014 16TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE AND EXPOSITION (PEMC), 2014, : 1295 - 1299
  • [38] Benefit-Cost Analysis of Building Information Modeling (BIM) in a Railway Site
    Shin, Min Ho
    Lee, Hye Kyung
    Kim, Hwan Yong
    [J]. SUSTAINABILITY, 2018, 10 (11):
  • [39] COST-BENEFIT ANALYSIS APPROACH FOR STRUCTURAL REINFORCEMENT OF "PILOTIS" BUILDING STRUCTURES
    da Silva, Manuel Tavares
    Falcao Silva, Maria Joao
    Cabaco, Antnio
    [J]. PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON MECHANICS AND MATERIALS IN DESIGN (M2D2017), 2017, : 1287 - +
  • [40] Cost–benefit analysis
    Grant Miura
    [J]. Nature Chemical Biology, 2018, 14 : 903 - 903