共 50 条
- [22] An improved particle swarm optimization algorithm for short-term scheduling of single-stage multiproduct batch plants with parallel lines [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2007, 14 : 895 - 904
- [23] An effective formulation for short-term scheduling of multipurpose batch plants [J]. PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 4333 - 4334
- [30] Multiple Time Grid Continuous-Time Formulation for the Short Term Scheduling of Multiproduct Batch Plants [J]. 16TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING AND 9TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2006, 21 : 2093 - 2098