Improvement on Bill of Materials Formatting Process by Adopting Lean and Six Sigma Approaches - A Case Study in a Semiconductor Industry

被引:1
|
作者
Abd Wahab, Ilhammee [1 ]
Ahmad, Rosmaini [2 ]
Mustafa, Shaliza Azreen [2 ]
Jusoh, Muhammad Shahar [3 ]
Din, Mohd Salleh Hj [3 ]
机构
[1] Univ Malaysia Perlis, Sch Mfg Engn, Ulu Pauh Campus, Arau 02600, Perlis, Malaysia
[2] Univ Malaysia Perlis, Sch Mfg Engn, Adv Mfg Syst AMS Res Grp, Ulu Pauh Campus, Arau 02600, Perlis, Malaysia
[3] Univ Malaysia Perlis, Sch Business Innovat & Technopreneurship, Jalan Alor Setar Kangar, Kangar 01000, Perlis, Malaysia
来源
关键词
Lean manufacturing; Six Sigma; Continuous improvement project; Case study; DMAIC; TOOLS APPLICATION;
D O I
10.30880/ijie.2019.11.08.009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper present an improvement project for the case of Bill of Materials (BOM) formatting process by adopting Lean and Six Sigma approaches. Currently, BOM formatting process involved repetitive tasks, where many of manual touches (manual computer mouse clicks), thus consumed a significant amount of time. The focus of Lean approach in this project is to identify and analyze the related wastes in the current BOM formatting process. Several Lean tools are applied such as, Root Cause Analysis (RCA), Five Whys analysis and Value Stream Mapping (VSM) concept to analyze the problem. Six Sigma approach plays an important role to systematically carry out the improvement project based on it well known method called; Define, Measure, Analyze, Improve and Control (DMAIC). This paper gives an insight that the right application of Lean and Six Sigma approaches will significantly helped an organization to achieve operational excellence, where in this project it happens at BOM formatting process. Through this project, the case study company has improved (reducing) the BOM processing time from average 50 to 5 minutes, while manual touches reduced from 290 to 30 touches only. Furthermore, elimination of these wastes (waiting and motion) has increase work efficiency and contributes to a significant financial savings to $1680 per month.
引用
收藏
页码:81 / 90
页数:10
相关论文
共 50 条
  • [31] Process improvement through Six Sigma - A case study of Agra foundry
    Kumar, Dilip
    Singh, Ranjit
    Yadav, Ashok
    2016 IEEE REGION 10 HUMANITARIAN TECHNOLOGY CONFERENCE (R10-HTC), 2016,
  • [32] Assessing the change process of Lean Six Sigma: a case analysis
    Lertwattanapongchai, Suriya
    Swierczek, Fredric William
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2014, 5 (04) : 423 - 443
  • [33] When Lean and Six Sigma converge: a case study of a successful implementation of Lean Six Sigma at an aerospace company
    Akbulut-Bailey, Asli Yagmur
    Motwani, Jaideep
    Smedley, Everett M.
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2012, 57 (1-3) : 18 - 32
  • [34] PROCESS AND QUALITY IMPROVEMENT USING SIX SIGMA IN CONSTRUCTION INDUSTRY
    Tchidi, Megan Florent
    He, Zhen
    Li, Yan Bo
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (02) : 158 - 172
  • [35] Lean Marketing: Application of the Lean Six Sigma to Marketing - Case Study
    Sa, Jose Carlos
    Pereira, Manuel Sousa
    Almeida, Sergio
    INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST 2022, VOL 3, 2022, 470 : 505 - 512
  • [36] Lean Marketing: Application of the Lean Six Sigma to Marketing - Case Study
    Sa, Jose Carlos
    Pereira, Manuel Sousa
    Almeida, Sergio
    INFORMATION SYSTEMS AND TECHNOLOGIES, WORLDCIST 2022, VOL 2, 2022, 469 : 66 - 73
  • [37] Application of lean Six Sigma methodology using DMAIC approach for the improvement of bogie assembly process in the railcar industry
    Daniyan, Ilesanmi
    Adeodu, Adefemi
    Mpofu, Khumbulani
    Maladzhi, Rendani
    Katumba, Mukondeleli Grace Kana-Kana
    HELIYON, 2022, 8 (03)
  • [38] Lean six sigma in a call centre: a case study
    Laureani, Alessandro
    Antony, Jiju
    Douglas, Alex
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2010, 59 (08) : 757 - 768
  • [39] Lean Six Sigma in internal logistics: A case study
    Sousa, S.
    Nunes, E.
    Antunes, D.
    IAENG TRANSACTIONS ON ENGINEERING SCIENCES, 2014, : 161 - 170
  • [40] Lean Six Sigma for the improvement of company processes: the Schnell S.p.A. case study
    Murmura, Federica
    Bravi, Laura
    Musso, Fabio
    Mosciszko, Aleksandra
    TQM JOURNAL, 2021, 33 (07): : 351 - 376