Dealing with Competing Project Management Values under Uncertainty: the Case of RandstadRail

被引:0
|
作者
Leijten, Martijn [1 ]
Koppenjan, Joop [1 ]
ten Heuvelhof, Ernst [1 ]
Veeneman, Wijnand [1 ]
van der Voort, Haiko [1 ]
机构
[1] Delft Univ Technol, Fac Technol Policy & Management, NL-2600 GA Delft, Netherlands
关键词
project management; competing values; principal-agent relations; uncertainty; ECONOMICS;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Due to the uncertainty involved in many complex infrastructure engineering projects, it is not always possible for managers to establish detailed terms of reference at the departure. Although the flexibility of 'open' terms of reference is often indispensible, it makes the arrival at a successful outcome much of a gamble. Complex infrastructure construction projects often include the tension that the values and interests of clients and functional managers diverge or even contradict each other. This is especially evident when managing the project management values of time, cost, scope and quality in relation to each other while the results of trade-offs and decisions can not be predicted. Client's administrators defend objectifiable, instrumental values, while functional managers have an interest in relaxing them in order to realise the project. If these two contradictory sets of interests are not recalibrated, either the values are not met, or trade-offs may be made in an uncontrolled way, which can lead to suboptimisations or even project failure. Using RandstadRail as an example, this paper will show the problems that may occur in such situations and how unmanageability arises. A few lessons are derived to provide entrance to better manageable practice.
引用
收藏
页码:63 / 76
页数:14
相关论文
共 50 条
  • [31] Dealing with Incompatibilities among Procedural Goals under Uncertainty
    Espinoza, Mariela Morveli
    Nieves, Juan Carlos
    Possebom, Ayslan
    Tacla, Cesar Augusto
    [J]. INTELIGENCIA ARTIFICIAL-IBEROAMERICAL JOURNAL OF ARTIFICIAL INTELLIGENCE, 2019, 22 (64): : 47 - 62
  • [32] Dealing with Non-linearity and Uncertainty in Forest Management
    Messier, Christian
    Puettmann, Klaus
    Filotas, Elise
    Coates, Dave
    [J]. CURRENT FORESTRY REPORTS, 2016, 2 (02): : 150 - 161
  • [33] Values and value management combine for a better project outcome - A case study
    McGregor, R.
    Polmear, R.
    Mauger, G.
    [J]. PROJECT EVALUATION CONFERENCE 2007, 2007, 2007 (04): : 43 - +
  • [34] From risk assessment to risk management; Dealing with uncertainty
    Courage, C
    [J]. FORESIGHT AND PRECAUTION, VOLS 1 AND 2, 2000, : 1093 - 1096
  • [35] Dealing with Non-linearity and Uncertainty in Forest Management
    Christian Messier
    Klaus Puettmann
    Elise Filotas
    Dave Coates
    [J]. Current Forestry Reports, 2016, 2 : 150 - 161
  • [36] Dealing with uncertainty: adaptive approaches to sustainable river management
    Clark, MJ
    [J]. AQUATIC CONSERVATION-MARINE AND FRESHWATER ECOSYSTEMS, 2002, 12 (04) : 347 - 363
  • [37] Using Nash bargaining to design project management contracts under cost uncertainty
    Lippman, Steven A.
    McCardle, Kevin E.
    Tang, Christopher S.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 145 (01) : 199 - 207
  • [38] Dynamic revenue management of a toll road project under transportation demand uncertainty
    Nagae, Takeshi
    Akamatsu, Takashi
    [J]. NETWORKS & SPATIAL ECONOMICS, 2006, 6 (3-4): : 345 - 357
  • [39] Dynamic Revenue Management of a Toll Road Project under Transportation Demand Uncertainty
    Takeshi Nagae
    Takashi Akamatsu
    [J]. Networks and Spatial Economics, 2006, 6 : 345 - 357
  • [40] Dealing with Missing Values in Software Project Datasets: A Systematic Mapping Study
    Idri, Ali
    Abnane, Ibtissam
    Abran, Alain
    [J]. SOFTWARE ENGINEERING, ARTIFICIAL INTELLIGENCE, NETWORKING AND PARALLEL/DISTRIBUTED COMPUTING, 2016, 653 : 1 - 16