Single machine scheduling with resource dependent release times and processing times

被引:26
|
作者
Wang, XL
Cheng, TCE [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Logist, Kowloon, Hong Kong, Peoples R China
[2] Shanghai Jiao Tong Univ, Dept Automat, Shanghai 200030, Peoples R China
关键词
scheduling; resource dependent release times; resource dependent processing times; heuristics; performance bound;
D O I
10.1016/j.ejor.2003.10.024
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the single machine scheduling problem with resource dependent release times and processing times, in which both the release times and processing times are strictly linear decreasing functions of the amount of resources consumed. The objective is to minimize the makespan plus the total resource consumption costs. We propose a heuristic algorithm for the general problem by utilizing some derived optimal properties and analyze its performance bound. For some special cases, we propose another heuristic algorithm that achieves a tighter performance bound. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:727 / 739
页数:13
相关论文
共 50 条