Effect of cycle changes on simultaneous biological nutrient removal in a sequencing batch reactor (SBR)

被引:8
|
作者
Coma, M. [1 ]
Puig, S. [2 ]
Monclus, H. [1 ]
Balaguer, M. D. [1 ]
Colprim, J. [1 ]
机构
[1] Univ Girona, Lab Chem & Environm Engn LEQUIA UdG, Inst Environm, Fac Ciences, Girona, Catalonia, Spain
[2] Univ Girona, Catalan Inst Water Res ICRA, Girona, Catalonia, Spain
关键词
biological nutrient removal; FISH; sequencing batch reactor; simultaneous nitrification-denitrification and phosphorus removal (SNDPR); step-feed; ACCUMULATING ORGANISMS; PHOSPHORUS REMOVAL; NITROGEN REMOVAL; CARBON; BACTERIA; NITRITE; PROBES;
D O I
10.1080/09593330903464043
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The destabilization of a microbial population is sometimes hard to solve when different biological reactions are coupled in the same reactor as in sequencing batch reactors (SBRs). This paper will try to guide through practical experiences the recovery of simultaneous nitrogen and phosphorus removal in an SBR after increasing the demand of wastewater treatment by taking advantage of its flexibility. The results demonstrate that the length of phases and the optimization of influent distribution are key factors in stabilizing the system for long-term periods with high nutrient removal (88%, 93% and 99% of carbon, nitrogen and phosphorus, respectively). In order to recover a biological nutrient removal (BNR) system, different interactions such as simultaneous nitrification and denitrification and also phosphorus removal must be taken into account. As a general conclusion, it can be stated there is no such thing as a perfect SBR operation, and that much will depend on the state of the BNR system. Hence, the SBR operating strategy must be based on a dynamic cycle definition in line with process efficiency.
引用
收藏
页码:285 / 294
页数:10
相关论文
共 50 条