An improved hybrid PV-wind power system with MPPT for water pumping applications

被引:31
|
作者
Priyadarshi, Neeraj [1 ]
Padmanaban, Sanjeevikumar [2 ]
Bhaskar, Mahajan Sagar [2 ]
Blaabjerg, Frede [3 ]
Holm-Nielsen, Jens Bo [2 ]
机构
[1] Birsa Inst Technol Trust, Dept Elect Engn, Ranchi 835217, Bihar, India
[2] Aalborg Univ, Dept Energy Technol, Ctr Bioenergy & Green Engn, DK-6700 Esbjerg, Denmark
[3] Aalborg Univ, Dept Energy Technol, Ctr Reliable Power Elect CORPE, Aalborg, Denmark
关键词
artificial bee colony; CUK converter; inverter; maximum power point tracking; particle swarm optimization; photovoltaic; space vector pulse-width modulation; wind; INVERTER; CONVERTER; ALGORITHM; TRACKING;
D O I
10.1002/2050-7038.12210
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This work articulates the hybrid photovoltaic-wind power system development for water pump applications. The proposed control scheme is based on modified Artificial Bee Colony (ABC)-based on Maximum Power Point Tracking (MPPT) algorithm.. On power circuit part, the single CUK converter-fed induction motor driven a centrifugal pump and has been employed, which improves the system overall performance. The proposed MPPT control provides the smooth propagation of the motor operation as well as forces the photovoltaic system to operate always in maximum power point (MPP) region. Further, the modified ABC algorithm strengthens searching competency and has been employed for the achievement of local optimal maximum power point (MPP) under partial shade conditions with high accuracy and zero oscillation around MPP region when compared with other optimized algorithms. Particle swarm optimization-space vector pulse-width modulation (PSO-SVPWM) was adapted for the inverter; control with standard v/f control is implemented in this work for better speed regulation and reduction in total harmonic distortion. Moreover, the power balance of the integrated hybrid system to the DC bus has been discussed with practicality. This article also explains the comparison of different MPPT algorithms and includes PSO, ant colony optimization, firefly algorithm, and ABC under fast-changing environmental conditions. In the case of classical ABC method, only one scout bee is responsible to achieve the local maximum. The proposed modified ABC has been used to improve searching capacity, with the addition of scout bees. Experimental results are presented and reveal that the modified ABC algorithm performs 7.5 times faster than the standard PSO technique. Prototype model in hardware setup is developed with MATLAB/Simulink interfaced with dSPACE DS 1104.
引用
收藏
页数:26
相关论文
共 50 条
  • [31] Design and evaluation of PV-wind hybrid system with hydroelectric pumped storage on the National Power System of Egypt
    Hamdy M.Sultan
    Ahmed A.Zaki Diab
    Kuznetsov Oleg N.
    Zubkova Irina S.
    Global Energy Interconnection, 2018, 1 (03) : 301 - 311
  • [32] Robust design and optimization for autonomous PV-wind hybrid power systems
    Jun-hai Shi
    Zhi-dan Zhong
    Xin-jian Zhu
    Guang-yi Cao
    Journal of Zhejiang University-SCIENCE A, 2008, 9 : 401 - 409
  • [33] Robust design and optimization for autonomous PV-wind hybrid power systems
    Shi, Jun-hai
    Zhong, Zhi-dan
    Zhu, Xin-jian
    Cao, Guang-yi
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2008, 9 (03): : 401 - 409
  • [34] Design and control of the hybrid system PV-Wind connected to the DC load
    Jomaa, Manel
    Allani, M. Yassine
    Tadeo, Fernando
    Mami, Abdelkader
    2018 9TH INTERNATIONAL RENEWABLE ENERGY CONGRESS (IREC), 2018,
  • [35] Optimization of PV-Wind Hybrid Renewable Energy system for Rural Electrification
    Fulzele, Jyoti B.
    Daigavane, M. B.
    2015 7TH INTERNATIONAL CONFERENCE ON EMERGING TRENDS IN ENGINEERING & TECHNOLOGY (ICETET), 2015, : 101 - 105
  • [36] Sizing a PV-Wind based hybrid system using deterministic approach
    Anoune, Kamal
    Laknizi, Azzeddine
    Bouya, Mohsine
    Astito, Abdelali
    Ben Abdellah, Abdellatif
    ENERGY CONVERSION AND MANAGEMENT, 2018, 169 : 137 - 148
  • [37] Performance evaluation of PV-Wind hybrid power generation system at Gobi-desert area
    Lee, JC
    Lee, JC
    Yun, JH
    Kim, SK
    Kim, HW
    Yoon, KH
    Kim, MI
    Hwang, JH
    Lee, SH
    Enebish, N
    Agchbayar, D
    CONFERENCE RECORD OF THE THIRTY-FIRST IEEE PHOTOVOLTAIC SPECIALISTS CONFERENCE - 2005, 2005, : 1683 - +
  • [38] Optimal sizing and deployment of gravity energy storage system in hybrid PV-Wind power plant
    Emrani, Anisa
    Berrada, Asmae
    Bakhouya, Mohamed
    RENEWABLE ENERGY, 2022, 183 : 12 - 27
  • [39] PV-wind hybrid system performance: A new approach and a case study
    Arribas, Luis
    Cano, Luis
    Cruz, Ignacio
    Mata, Montserrat
    Llobet, Ermen
    RENEWABLE ENERGY, 2010, 35 (01) : 128 - 137
  • [40] State of Art on Possibility & Optimization of Solar PV-Wind Hybrid System
    Hasan, Md Mehedi
    Chowdhury, Nusrat
    Hossain, Chowdhury Akram
    Longo, Michela
    2019 1ST INTERNATIONAL CONFERENCE ON ROBOTICS, ELECTRICAL AND SIGNAL PROCESSING TECHNIQUES (ICREST), 2019, : 598 - 601