A Model for Optimizing Railway Alignment Considering Bridge Costs, Tunnel Costs, and Transition Curves

被引:18
|
作者
Ghoreishi, Benyamin [1 ]
Shafahi, Yousef [1 ]
Hashemian, Seyed Elyas [2 ]
机构
[1] Sharif Univ Technol, Dept Civil Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Civil Engn, Tehran, Iran
关键词
Optimization; Railway alignment; Particle swarm optimization (PSO) algorithm; Transition curves; Bridges and tunnels; Geographic information systems; OPTIMIZATION; SELECTION;
D O I
10.1007/s40864-019-00111-5
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Owing to wide-ranging searches (there are various alignments between two points) as well as complex and nonlinear cost functions and a variety of geometric constraints, the problem of optimal railway alignment is classified as a complex problem. Thus, choosing an alignment between two points is usually done based on a limited number of alignments designed by experts. In recent years, the study of railway alignment optimization has shown the importance of optimization and the introduction of various algorithms and their usefulness in solving different problems. It is expected that applying meta-heuristic optimization algorithms such as methods based on swarm intelligence can lead to better alignments. In this study, we tried to modify models based on previous studies in order to design and develop a model based on a single framework to provide three-dimensional optimization of alignments applicable in the real world. To obtain this, the particle swarm algorithm is used and a geographic information system is incorporated as a means of search in three-dimensional space. In particular, the cost function used in previous studies considering the costs related to structures (bridges and tunnels) are improved regarding hydraulic structure alignments. Furthermore, the transition curve of horizontal alignment and slope restrictions of curves are considered in this project by using the penalty function in order to obtain the most practical results possible. Finally, this study examines three problems for which the results are acceptable in cases of railway alignment geometry and its application in the real world.
引用
收藏
页码:207 / 224
页数:18
相关论文
共 50 条
  • [31] Competition with Online and Offline Demands considering Logistics Costs Based on the Hotelling Model
    Hu, Zhi-Hua
    Wei, Chen
    Li, Qing
    Xiao, Fan
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [32] A supplier allocation model considering delivery failure, maintenance and supplier cycle costs
    Ruiz-Torres, Alex J.
    Mahmoodi, Farzad
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (02) : 755 - 766
  • [33] An available-to-promise model considering customer priority and variance of penalty costs
    Jung, Hosang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (1-4): : 369 - 377
  • [34] A robust optimization model for software development costs considering time value of money
    Namdar, Mohammadreza
    Noorossana, Rassoul
    [J]. JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2024, 36 (07)
  • [35] A MATHEMATICAL-MODEL FOR CELL-FORMATION CONSIDERING INVESTMENT AND OPERATIONAL COSTS
    ADIL, GK
    RAJAMANI, D
    STRONG, D
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 69 (03) : 330 - 341
  • [36] A Markov-Based Road Maintenance Optimization Model Considering User Costs
    Gao, Hui
    Zhang, Xueqing
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2013, 28 (06) : 451 - 464
  • [37] An available-to-promise model considering customer priority and variance of penalty costs
    Hosang Jung
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 369 - 377
  • [38] A model for optimizing performance based on reliability, life-cycle costs and other measurements
    Prasad, B
    [J]. PRODUCTION PLANNING & CONTROL, 1999, 10 (03) : 286 - 300
  • [39] A Markov-based prediction model of tunnel geology, construction time, and construction costs
    Mahmoodzadeh, Arsalan
    Mohammadi, Mokhtar
    Hama, Hunar Farid
    Salim, Sirwan Ghafoor
    Abdulhamid, Sazan Nariman
    Ibrahim, Hawkar Hashim
    Rashidi, Shima
    [J]. GEOMECHANICS AND ENGINEERING, 2022, 28 (04) : 421 - 435
  • [40] Uncertain portfolio selection model considering transaction costs and minimum transaction lots requirement
    Zhang, Chao
    Hu, Rui
    Wei, Lirong
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (06) : 4543 - 4554