A comparison of different solution approaches to the vehicle scheduling problem in a practical case

被引:54
|
作者
Baita, F
Pesenti, R
Ukovich, W [1 ]
Favaretto, D
机构
[1] Univ Palermo, Dipartimento Automat & Informat, I-90133 Palermo, Italy
[2] Univ Trieste, Dipartimento Elettrotecn Elettron & Informat, I-34127 Trieste, Italy
[3] Univ Venice, Dipartimento Matemat Applicata & Informat, I-30123 Venice, Italy
关键词
vehicle scheduling problem; multicriteria optimization; assignment problem; logic programming; genetic algorithms;
D O I
10.1016/S0305-0548(99)00073-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The Vehicle Scheduling Problem (VSP) consists in assigning a set of scheduled trips to a set of vehicles, satisfying a set of constraints and optimizing an objective function. A wide literature exists for the VSP, but usually not all the practical requirements of the real cases are taken into account. In the present paper a practical case is studied, and for it a traditional method is tailored and two innovative heuristics are developed. As the problem presents a multicriteria nature, each of the three algorithms adopts a different approach to multicriteria optimization. Scalarization of the different criteria is performed by the traditional algorithm. A lexicographic approach is followed by an algorithm based on logic programming. Finally, a Pareto optimization approach is implemented by a modified genetic algorithm. All the algorithms are tested on the real problem, and two of them produce interesting practical results.
引用
下载
收藏
页码:1249 / 1269
页数:21
相关论文
共 50 条
  • [31] Interactive heuristic for practical vehicle routing problem with solution shape constraints
    Tang, Hao
    Miller-Hooks, Elise
    NETWORK MODELING 2006, 2006, (1964): : 9 - 18
  • [32] Solution of a practical Vehicle Routing Problem for monitoring Water Distribution Networks
    Atefi, Reza
    Iori, Manuel
    Salari, Majid
    Vezzali, Dario
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2023, 75 (10) : 1989 - 2007
  • [33] Different approaches for the solution of a backward heat conduction problem
    Chiwiacowsky, LD
    Velho, HFD
    INVERSE PROBLEMS IN ENGINEERING, 2003, 11 (06): : 471 - 494
  • [34] Electric vehicle scheduling and optimal charging problem: complexity, exact and heuristic approaches
    Sassi, Ons
    Oulamara, Ammar
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (02) : 519 - 535
  • [35] General solution approaches for multi-attribute vehicle routing and scheduling problems
    Thibaut Vidal
    4OR, 2014, 12 : 97 - 98
  • [36] General solution approaches for multi-attribute vehicle routing and scheduling problems
    Vidal, Thibaut
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2014, 12 (01): : 97 - 98
  • [37] Formulation and Solution Approaches to the Rail Maintenance Production Gang Scheduling Problem
    Gorman, Michael F.
    Kanet, John J.
    JOURNAL OF TRANSPORTATION ENGINEERING, 2010, 136 (08) : 701 - 708
  • [38] Solution approaches for the vehicle routing problem with occasional drivers and time windows
    Pugliese, Luigi Di Puglia
    Ferone, Daniele
    Festa, Paola
    Guerriero, Francesca
    Macrina, Giusy
    OPTIMIZATION METHODS & SOFTWARE, 2022, 37 (04): : 1384 - 1414
  • [39] New exact solution approaches for the split delivery vehicle routing problem
    Ozbaygin, Gizem
    Karasan, Oya
    Yaman, Hande
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2018, 6 (01) : 85 - 115
  • [40] Comparison of three different approaches for the optimization of the CSP plant scheduling
    Petrollese, Mario
    Cocco, Daniele
    Cau, Giorgio
    Cogliani, Euro
    SOLAR ENERGY, 2017, 150 : 463 - 476