Complementing lean with quick response manufacturing: case studies

被引:9
|
作者
Gomez P, Fernando J. [1 ]
Godinho Filho, Moacir [1 ]
机构
[1] Univ Fed Sao Carlos, Ind Engn, Rod Washington Luiz Km 235, BR-13565905 Sao Paulo, Brazil
关键词
Lean manufacturing; Quick response manufacturing; Lead time reduction; Make-to-order; Manufacturing environment; SUPPLY-CHAIN; TO-ORDER; OPPORTUNITIES; EVOLUTION; BUNDLES; SYSTEMS; ERP;
D O I
10.1007/s00170-016-9513-4
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Operations management researchers have largely studied and analysed lean manufacturing (LM) for its capacity for productivity improvement in industry. Even so, this approach has found several difficulties in dealing with all production types, especially in high-variety and low-volume production. Managers have complemented other approaches to LM to resolve those issues, but there is little research considering quick response manufacturing (QRM). This research shows how QRM can complement LM in a make-to-order environment. Two cases were analysed, where both approaches were used in a complementary way. Data were collected throughout interviews, document analyses and observation. As the main result, we show that QRM complements LM by means of incorporating concepts of system dynamics, exclusively focusing on lead time reduction and the continuous monitoring of utilisation levels.
引用
收藏
页码:1897 / 1910
页数:14
相关论文
共 50 条
  • [31] Lean readiness - the case of the European pharmaceutical manufacturing industry
    Garza-Reyes, Jose Arturo
    Betsis, Ioannis E.
    Kumar, Vikas
    Al-Shboul, Moh'd Anwer Radwan
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2018, 67 (01) : 20 - 44
  • [32] Lean Manufacturing Implementation in Carton Industry - A case study
    Shafeek, Hani
    [J]. 2019 INDUSTRIAL & SYSTEMS ENGINEERING CONFERENCE (ISEC), 2019,
  • [33] Lean Manufacturing Case Study with Kanban System Implementation
    Rahman, Nor Azian Abdul
    Sharif, Sariwati Mohd
    Esa, Mashitah Mohamed
    [J]. INTERNATIONAL CONFERENCE ON ECONOMICS AND BUSINESS RESEARCH 2013 (ICEBR 2013), 2013, 7 : 174 - 180
  • [34] The Feasibility of Adopting Lean Manufacturing in China: A Case Study
    Wei, Jerry C.
    Chung, Wayne
    [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT, 2008, : 451 - 458
  • [35] ABB TEAMS UP WITH UNIVERSITY TO DRIVE QUICK RESPONSE MANUFACTURING
    SURI, R
    VEERAMANI, R
    CHURCH, J
    [J]. IIE SOLUTIONS, 1995, 27 (11): : 27 - 30
  • [36] Quick response procurement cost control strategy for fabric manufacturing
    Yan, H.
    Tang, S. -L.
    Yen, G.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (17) : 4769 - 4784
  • [37] Quick response manufacturing: A companywide approach to reducing lead times
    Olson, RE
    [J]. QUALITY PROGRESS, 1999, 32 (06) : 95 - 95
  • [38] MANAGEMENT MECHANISM FOR IMPLEMENTATION OF "QUICK RESPONSE MANUFACTURING" CONCEPT IN THE ENTERPRISE
    Popov, Viktor
    Ostapenko, Galina
    [J]. INNOVATION MANAGEMENT, ENTREPRENEURSHIP AND CORPORATE SUSTAINABILITY (IMECS 2016), 2016, : 583 - 594
  • [39] The Evaluation for the Mission-Time of Quick Response Manufacturing System
    Liang, Liang
    Guo, Bo
    [J]. INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, : 390 - +
  • [40] Quick response manufacturing shop floor control-an oxymoron? No!
    [J]. Natl Electron Packag Prod Conf Proc Tech Program, (138-151):