The impact of irrelevant information on estimates of software development effort

被引:6
|
作者
Grimstad, Stein [1 ]
Jorgensen, Magne [2 ]
机构
[1] Univ Oslo, Simula Res Lab, PO Box 134, N-0316 Oslo, Norway
[2] Simula Res Lab, N-1325 Lysaker, Norway
来源
2007 AUSTRALIAN SOFTWARE ENGINEERING CONFERENCE, PROCEEDINGS | 2007年
关键词
D O I
10.1109/ASWEC.2007.48
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
Software professionals typically estimate software development effort based on a requirement specification. Parts of this specification frequently contain information that is irrelevant to the estimation of the actual effort involved in the development of software. We hypothesize that effort-irrelevant information sometimes has a strong impact on effort estimates. To test this hypothesis, we conducted two controlled experiments with software professionals. In each of the experiments, the software If professionals received specifications describing the same requirements. However, we gave one group of the software professionals a version of the requirement specification where we had included additional, effort-irrelevant, information. In both experiments we observed that the estimates of most likely effort increased when the estimates were based on requirement specifications that contained the information irrelevant to development effort. The results suggest that when estimation-irrelevant information is included as input to expert judgment-based estimation processes, the estimators find it difficult to distinguish between the estimation-relevant and the estimation-irrelevant information. A possible consequence of our findings is that estimation-irrelevant information should be removed from the requirement specification prior to the use of it as input to estimation work.
引用
收藏
页码:359 / +
页数:3
相关论文
共 50 条
  • [21] An empirical study of the impact of team size on software development effort
    Parag C. Pendharkar
    James A. Rodger
    Information Technology and Management, 2007, 8 : 253 - 262
  • [22] The clients' impact on effort estimation accuracy in software development projects
    Grimstad, S
    Jorgensen, M
    Molokken-Ostvold, K
    2005 11TH INTERNATIONAL SYMPOSIUM ON SOFTWARE METRICS (METRICS), 2005, : 4 - 13
  • [23] Investigating Documented Information for Accurate Effort Estimation in Agile Software Development
    Pasuksmit, Jirat
    PROCEEDINGS OF THE 29TH ACM JOINT MEETING ON EUROPEAN SOFTWARE ENGINEERING CONFERENCE AND SYMPOSIUM ON THE FOUNDATIONS OF SOFTWARE ENGINEERING (ESEC/FSE '21), 2021, : 1605 - 1609
  • [24] Impact of Budget and Schedule Pressure on Software Development Cycle Time and Effort
    Nan, Ning
    Harter, Donald E.
    IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2009, 35 (05) : 624 - 637
  • [25] Estimation of effort and cost in the development of software for the dissemination of information through the cell phone
    Morales Gonzalez, Alvaro Ignacio
    Pelaez Valencia, Luis Eduardo
    Pinto Romero, Wilson
    ENTRE CIENCIA E INGENIERIA, 2008, (03): : 26 - 40
  • [26] The size and effort estimates in iterative development
    Hericko, Marjan
    Zivkovic, Ales
    INFORMATION AND SOFTWARE TECHNOLOGY, 2008, 50 (7-8) : 772 - 781
  • [27] Aging and the Impact of Irrelevant Information on Social Judgments
    Hess, Thomas M.
    Smith, Brian T.
    PSYCHOLOGY AND AGING, 2014, 29 (03) : 542 - 553
  • [28] An evaluation of effort estimation supported by change impact analysis in agile software development
    Tanveer, Binish
    Vollmer, Anna Maria
    Braun, Stefan
    bin Ali, Nauman
    JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2019, 31 (05)
  • [29] The Effects of Software Size on Development Effort and Software Quality
    Jiang, Zhizhong
    Naude, Peter
    Jiang, Binghua
    PROCEEDINGS OF WORLD ACADEMY OF SCIENCE, ENGINEERING AND TECHNOLOGY, VOL 23, 2007, 23 : 363 - +
  • [30] Guidelines for Software Development Effort Estimation
    Basten, Dirk
    Sunyaev, Ali
    COMPUTER, 2011, 44 (10) : 87 - 89