Improving ward level efficiency using a modified treatment room layout according to Lean methodologies

被引:1
|
作者
Boyle, Seamus [1 ]
Tyrrell, Oisin [1 ]
Quigley, Ailbhe [1 ]
Wall, Catherine [1 ]
机构
[1] Tallaght Univ Hosp Sligo, Sligo F91 H684, Ireland
关键词
Lean; Treatment room; PERFORMANCE;
D O I
10.1007/s11845-021-02590-7
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
Introduction Standardised ward treatment rooms have the potential to improve efficiency in performing routine tasks. Our aim was to produce a standardised layout for commonly used equipment using a Lean approach. Methods A standardised layout was devised for equipment used for venepuncture, intravenous cannulation (IVC), arterial blood gas sampling, urinary catheter insertion and nasogastric tube insertion. Stakeholder engagement was sought from house officers (HO), nursing staff, store staff and care attendants. HO were timed gathering equipment pre- and post-intervention, and a questionnaire was distributed. Feedback from all potential stakeholders contributed to the final design using repeat Plan, Do, Study, Act (PDSA) cycles. Results The intervention was implemented across 20 inpatient wards, in 3 tertiary university teaching hospitals. The mean time taken to gather equipment for IVC significantly reduced, from 94.9 to 33.9 s (n = 166; p < 0.0001). Self-reported frustration among HO with the treatment room significantly decreased from 54.9 to 4.5% (p < 0.0001). There was a 62.3% reduction in the need for HO to ask other ward staff for help to locate equipment. Conclusion This study demonstrates improved efficiency with a time saving of over 1 min for a very commonly performed ward-based task. Ward-based staff reported reduced frustration and less interruptions following the standardisation and optimisation of treatment room layouts.
引用
收藏
页码:127 / 132
页数:6
相关论文
共 50 条
  • [1] Improving ward level efficiency using a modified treatment room layout according to Lean methodologies
    Seamus Boyle
    Oisín Tyrrell
    Ailbhe Quigley
    Catherine Wall
    [J]. Irish Journal of Medical Science (1971 -), 2022, 191 : 127 - 132
  • [2] Improving operating room efficiency using lean management tools
    Sales-Coll, Marc
    de Castro, Rodolfo
    Hueto-Madrid, Juan A.
    [J]. PRODUCTION PLANNING & CONTROL, 2023, 34 (13) : 1261 - 1274
  • [3] Improving efficiency in the accessioning department using LEAN
    Morgan, L.
    Rasey, M.
    Malone, M.
    Robertson, G.
    Caglioti, S.
    [J]. TRANSFUSION, 2008, 48 (02) : 278A - 278A
  • [4] Improving project efficiency using Lean Construction
    Karningsih, Putu Dana
    Anggrahini, Dewanti
    Karim, Mohammad Busyral
    Adhitama, Rizki
    [J]. 2017 INTERNATIONAL CONFERENCE ON ADVANCED MECHATRONICS, INTELLIGENT MANUFACTURE, AND INDUSTRIAL AUTOMATION (ICAMIMIA), 2017, : 334 - 336
  • [5] Improving operating room efficiency in academic children's hospital using Lean Six Sigma methodology
    Tagge, Edward P.
    Thirumoorthi, Arul S.
    Lenart, John
    Garberoglio, Carlos
    Mitchell, Kenneth W.
    [J]. JOURNAL OF PEDIATRIC SURGERY, 2017, 52 (06) : 1040 - 1044
  • [6] Using Lean Methodologies to Improve Efficiency in an Outpatient OB/GYN Setting
    van Nes, Jaclyn
    [J]. OBSTETRICS AND GYNECOLOGY, 2018, 131 : 120S - 121S
  • [7] Designing a Laboratory While Improving Efficiency Using LEAN
    Morgan, L.
    Bodiya, J. L.
    Noedel, M.
    Turner, R.
    Patterson, L.
    Williams, J. Dunn
    [J]. TRANSFUSION, 2010, 50 : 277A - 277A
  • [8] Improving Construction Processes Using Lean Management Methodologies - Cost Case Study
    Nowotarski, Piotr
    Paslawski, Jerzy
    Matyja, Jakub
    [J]. WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016, 2016, 161 : 1037 - 1042
  • [9] Improving Efficiency of Mineral Terminal Performance using Lean Railroading
    Fakoor, Arghavan
    Mehranfar, Hamed
    Bagheri, Morteza
    Ahmadi, Abbas
    [J]. TRANSPORTATION RESEARCH RECORD, 2019, 2673 (11) : 915 - 924
  • [10] Improving the Efficiency of Highway Construction Project Management Using Lean Management
    Wu, Xueying
    Zhao, Wenyi
    Ma, Tianshan
    Yang, Ziyu
    [J]. SUSTAINABILITY, 2019, 11 (13):