Improving Efficiency of Mineral Terminal Performance using Lean Railroading

被引:1
|
作者
Fakoor, Arghavan [1 ]
Mehranfar, Hamed [1 ]
Bagheri, Morteza [1 ]
Ahmadi, Abbas [2 ]
机构
[1] Iran Univ Sci & Technol, Sch Railway Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn & Management Syst, Tehran, Iran
关键词
D O I
10.1177/0361198119859310
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this study is to investigate and identify the waste from the unloading station of mineral cars using the lean thinking approach. In this paper, one of the largest steel producers is investigated as a case study. The time information was collected from the database system of the factory and railway company from April to July 2017. The wastes were identified by using the value stream map, and to reduce the waste, ten solutions have been proposed based on the changes in: (a) operation management; (b) purchase of new equipment; and (c) infrastructure development. Implementation of solutions using the Planimate simulator software shows that the best strategy consists of a combination of three operational management solutions without having to purchase new equipment and without any infrastructure development, which can improve station performance by up to 52% with regards to the total time for the unloading process. In addition, the valuable time of the whole process has been increased from 9 to 19%. This improvement will result in an increase of 21% in the annual turnover of cars to the station destination. As a result, each car annually carries on average 450 tons more freight, in which case the railway's revenues from carrying iron ore would be increased by 24% for this destination.
引用
收藏
页码:915 / 924
页数:10
相关论文
共 50 条
  • [1] Lean railroading for improving railroad classification terminal performance - Bottleneck management methods
    Dirnberger, Jeremiah R.
    Barkan, Christopher P. L.
    [J]. TRANSPORTATION RESEARCH RECORD, 2007, (1995) : 52 - 61
  • [2] Improving efficiency in the accessioning department using LEAN
    Morgan, L.
    Rasey, M.
    Malone, M.
    Robertson, G.
    Caglioti, S.
    [J]. TRANSFUSION, 2008, 48 (02) : 278A - 278A
  • [3] Improving project efficiency using Lean Construction
    Karningsih, Putu Dana
    Anggrahini, Dewanti
    Karim, Mohammad Busyral
    Adhitama, Rizki
    [J]. 2017 INTERNATIONAL CONFERENCE ON ADVANCED MECHATRONICS, INTELLIGENT MANUFACTURE, AND INDUSTRIAL AUTOMATION (ICAMIMIA), 2017, : 334 - 336
  • [4] Designing a Laboratory While Improving Efficiency Using LEAN
    Morgan, L.
    Bodiya, J. L.
    Noedel, M.
    Turner, R.
    Patterson, L.
    Williams, J. Dunn
    [J]. TRANSFUSION, 2010, 50 : 277A - 277A
  • [5] Lean approach to improving performance and efficiency in a nuclear medicine department
    Luca, Burroni
    Caterina, Bianciardi
    Cinzia, Romagnolo
    Chiara, Cottignoli
    Andrea, Palucci
    Massimo, Fringuelli Fabio
    Giuseppina, Biscontini
    Jacopo, Guercini
    [J]. CLINICAL AND TRANSLATIONAL IMAGING, 2021, 9 (02) : 129 - 139
  • [6] Lean approach to improving performance and efficiency in a nuclear medicine department
    Luca Burroni
    Caterina Bianciardi
    Cinzia Romagnolo
    Chiara Cottignoli
    Andrea Palucci
    Fabio Massimo Fringuelli
    Giuseppina Biscontini
    Jacopo Guercini
    [J]. Clinical and Translational Imaging, 2021, 9 : 129 - 139
  • [7] Improving operating room efficiency using lean management tools
    Sales-Coll, Marc
    de Castro, Rodolfo
    Hueto-Madrid, Juan A.
    [J]. PRODUCTION PLANNING & CONTROL, 2023, 34 (13) : 1261 - 1274
  • [8] Correction to: Lean approach to improving performance and efficiency in a nuclear medicine department
    Luca Burroni
    Caterina Bianciardi
    Cinzia Romagnolo
    Chiara Cottignoli
    Andrea Palucci
    Fabio Massimo Fringuelli
    Giuseppina Biscontini
    Jacopo Guercini
    [J]. Clinical and Translational Imaging, 2021, 9 : 403 - 403
  • [9] Quality Initiatives Lean Approach to Improving Performance and Efficiency in a Radiology Department
    Kruskal, Jonathan B.
    Reedy, Allen
    Pascal, Laurie
    Rosen, Max P.
    Boiselle, Phillip M.
    [J]. RADIOGRAPHICS, 2012, 32 (02) : 573 - 587
  • [10] Improving the Efficiency of Highway Construction Project Management Using Lean Management
    Wu, Xueying
    Zhao, Wenyi
    Ma, Tianshan
    Yang, Ziyu
    [J]. SUSTAINABILITY, 2019, 11 (13):