共 50 条
- [23] DETERMINING THE OPTIMAL OPERATING PARAMETERS OF THE WHEEL BUCKET EXCAVATOR AT THE WORK IN OVERBURDEN GEOCONFERENCE ON SCIENCE AND TECHNOLOGIES IN GEOLOGY, EXPLORATION AND MINING, SGEM 2013, VOL I, 2013, : 403 - +
- [25] DYNAMICS AND CONTROL OF THE BUCKET-WHEEL EXCAVATOR PART I: DYNAMIC MODELING OF BUCKET-WHEEL BOOM PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2014, VOL 6, 2014,
- [27] DYNAMICS AND CONTROL OF THE BUCKET-WHEEL EXCAVATOR PART II: VIBRATION CONTROL OF BUCKET-WHEEL BOOM PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2014, VOL 6, 2014,
- [29] PERFORMANCE FACTORS OF THE BUCKET WHEEL EXCAVATOR SYSTEMS. Transactions of the American Institute of Mining, Metallurgical, and Petroleum Engineers, Society, 1986, 280 (pt A): : 1904 - 1911
- [30] A prototype bucket wheel excavator for the moon, Mars and Phobos SPACE TECHNOLOGY AND APPLICATIONS INTERNATIONAL FORUM-STAIF 2004, 2004, 699 : 967 - 974