Benchmarking preproject planning effort

被引:46
|
作者
Hamilton, MR [1 ]
Gibson, GE [1 ]
机构
[1] UNIV TEXAS,DEPT CIVIL ENGN,AUSTIN,TX 78712
关键词
D O I
10.1061/(ASCE)0742-597X(1996)12:2(25)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Benchmarking key performance areas is key to continual improvement of processes. This paper focuses on measurement and benchmarking of the preproject-planning process for capital construction. While experienced members of the construction industry recognize that more effort put into early project planning results in a more successful project, there are few published studies that quantitatively verify this fact. This paper reviews a methodology developed to benchmark the preproject-planning phase to provide a basis for action, follow-up studies, and recalibration of measures and benchmarks. The project that was the object of this study measured the level of preproject-planning effort performed. This level was then related to the ultimate success of the project using data gathered on 62 projects and totaling more than $3.4 billion in authorized cost. Through formal preproject-planning effort, risk is reduced, cost performance can increase by as much as 20%, and schedule performance by as much as 40%.
引用
收藏
页码:25 / 33
页数:9
相关论文
共 50 条
  • [41] PLANNING ANNUAL ALLOCATION OF FISHERIES SURVEILLANCE EFFORT
    MILLAR, HH
    FISHERIES RESEARCH, 1995, 23 (3-4) : 345 - 360
  • [42] Impediments to the discharge planning effort for psychiatric inpatients
    Gantt, AB
    Cohen, NL
    Sainz, A
    SOCIAL WORK IN HEALTH CARE, 1999, 29 (01) : 1 - 14
  • [43] Allocating Planning Effort When Actions Expire
    Shperberg, Shahaf S.
    Coles, Andrew
    Cserna, Bence
    Karpas, Erez
    Ruml, Wheeler
    Shimony, Solomon E.
    THIRTY-THIRD AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE / THIRTY-FIRST INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE / NINTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE, 2019, : 2371 - 2378
  • [44] THE FAMILY PLANNING ASSOCIATION - NEED FOR VOLUNTARY EFFORT
    不详
    BRITISH MEDICAL JOURNAL, 1949, 2 (4617): : 29 - 29
  • [45] METHOD FOR PLANNING OF TESTPOINTS AND FOR REDUCTION OF RESEARCH EFFORT
    SALJE, E
    BRANDIN, H
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1978, 68 (03): : 155 - 156
  • [46] DETERMINANTS OF NATIONAL FAMILY-PLANNING EFFORT
    KELLY, WR
    CUTRIGHT, P
    POPULATION RESEARCH AND POLICY REVIEW, 1983, 2 (02) : 111 - 130
  • [47] Release planning under fuzzy effort constraints
    Ngo-The, A
    Ruhe, G
    Shen, W
    PROCEEDINGS OF THE THIRD IEEE INTERNATIONAL CONFERENCE ON COGNITIVE INFORMATICS, 2004, : 168 - 175
  • [48] Planning effort as an effective risk management tool
    Zwikael, Ofer
    Sadeh, Arik
    JOURNAL OF OPERATIONS MANAGEMENT, 2007, 25 (04) : 755 - 767
  • [49] DLBricks: Composable Benchmark Generation to Reduce Deep Learning Benchmarking Effort on CPUs
    Li, Cheng
    Dakkak, Abdul
    Xiong, Jinjun
    Hwu, Wen-mei
    PROCEEDINGS OF THE ACM/SPEC INTERNATIONAL CONFERENCE ON PERFORMANCE ENGINEERING (ICPE'20), 2020, : 202 - 209
  • [50] Path Planning Algorithms Benchmarking for Grapevines Pruning and Monitoring
    Magalhaes, Sandro Augusto
    dos Santos, Filipe Neves
    Martins, Rui Costa
    Rocha, Luis F.
    Brito, Jose
    PROGRESS IN ARTIFICIAL INTELLIGENCE, PT II, 2019, 11805 : 295 - 306