Benchmarking preproject planning effort

被引:46
|
作者
Hamilton, MR [1 ]
Gibson, GE [1 ]
机构
[1] UNIV TEXAS,DEPT CIVIL ENGN,AUSTIN,TX 78712
关键词
D O I
10.1061/(ASCE)0742-597X(1996)12:2(25)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Benchmarking key performance areas is key to continual improvement of processes. This paper focuses on measurement and benchmarking of the preproject-planning process for capital construction. While experienced members of the construction industry recognize that more effort put into early project planning results in a more successful project, there are few published studies that quantitatively verify this fact. This paper reviews a methodology developed to benchmark the preproject-planning phase to provide a basis for action, follow-up studies, and recalibration of measures and benchmarks. The project that was the object of this study measured the level of preproject-planning effort performed. This level was then related to the ultimate success of the project using data gathered on 62 projects and totaling more than $3.4 billion in authorized cost. Through formal preproject-planning effort, risk is reduced, cost performance can increase by as much as 20%, and schedule performance by as much as 40%.
引用
收藏
页码:25 / 33
页数:9
相关论文
共 50 条
  • [1] What is preproject planning, anyway?
    Gibson, GE
    Wang, YR
    Cho, CS
    Pappas, MP
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2006, 22 (01) : 35 - 42
  • [2] Alignment during preproject planning
    Griffith, AF
    Gibson, GE
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (02) : 69 - 76
  • [3] Preproject planning for microelectronics facilities
    Chasey, Allan D.
    Guo, Jia
    Cost Engineering (Morgantown, West Virginia), 2000, 42 (03): : 38 - 44
  • [5] Comparison of Preproject Planning for Green and Conventional Buildings
    Kang, Youngcheol
    Kim, Changwan
    Son, Hyojoo
    Lee, Seungtaek
    Limsawasd, Charinee
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (11)
  • [6] PREPROJECT-PLANNING PROCESS FOR CAPITAL FACILITIES
    GIBSON, GE
    KACZMAROWSKI, JH
    LORE, HE
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03): : 312 - 318
  • [7] The Role of Benchmarking Data in the Software Development and Enhancement Projects Effort Planning
    Czarnacka-Chrobot, Beata
    NEW TRENDS IN SOFTWARE METHODOLOGIES, TOOLS AND TECHNIQUES, 2009, 199 : 106 - 127
  • [8] Prioritizing Preproject Planning Activities Using Value of Information Analysis
    Esfahani, Mansour Esnaashary
    Rausch, Chris
    Haas, Carl
    Adey, Bryan T.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (05)
  • [9] A study of preproject planning and project success using ANN and regression models
    Wang, Yu-Ren
    Gibson, G. Edward, Jr.
    25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 688 - +
  • [10] A study of preproject planning and project success using ANNs and regression models
    Wang, Yu-Ren
    Gibson, G. Edward, Jr.
    AUTOMATION IN CONSTRUCTION, 2010, 19 (03) : 341 - 346