A dynamic optimisation approach for a single machine scheduling problem with machine conditions and maintenance decisions

被引:11
|
作者
Yang, Wenhui [1 ]
Chen, Lu [1 ]
Dauzere-Peres, Stephane [2 ,3 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, Shanghai 200240, Peoples R China
[2] Univ Clermont Auvergne, Dept Mfg Sci & Logist, Mines St Etienne, CNRS,UMR LIMOS 6158,CMP, Gardanne, France
[3] BI Norwegian Business Sch, Dept Accounting Auditing & Business Analyt, Oslo, Norway
基金
中国国家自然科学基金;
关键词
Single machine scheduling; machine condition; Markov decision process; dynamic optimisation approach; maintenance;
D O I
10.1080/00207543.2021.1910746
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In modern production systems, considering machine conditions is becoming essential to achieving an overall optimisation of the production schedule. This paper studies a single machine scheduling problem, where the actual processing times of jobs depend on their position in the production sequence and maintenance is considered. Moreover, the machine is subject to an uncertain condition variation. There is a trade-off between rejecting a maintenance action, resulting in longer processing times, and accepting a maintenance action, leading to higher processing efficiency for future jobs. The problem is formulated as a finite-horizon Markov Decision Process. The objective is to minimise the makespan. Optimality properties are analysed, based on which a dynamic optimisation approach is developed. Computational experiments demonstrate the effectiveness of the proposed approach.
引用
收藏
页码:3047 / 3062
页数:16
相关论文
共 50 条
  • [41] Single machine scheduling problem with two synergetic agents and piece-rate maintenance
    Yu, Xianyu
    Zhang, Yulin
    Xu, Dehua
    Yin, Yunqiang
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (03) : 1390 - 1399
  • [42] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    TANG HengYong~+ ZHAO ChuanLi CHENG CongDian College of Mathematics and Systems Science
    [J]. Science China Mathematics, 2008, (02) : 273 - 292
  • [43] Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
    Hanane Krim
    Rachid Benmansour
    David Duvivier
    Daoud Aït-Kadi
    Said Hanafi
    [J]. Computational Optimization and Applications, 2020, 75 : 291 - 320
  • [44] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance
    Krim, Hanane
    Benmansour, Rachid
    Duvivier, David
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
  • [45] Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance
    Krim, Hanane
    Benmansour, Rachid
    Duvivier, David
    Ait-Kadi, Daoud
    Hanafi, Said
    [J]. COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2020, 75 (01) : 291 - 320
  • [46] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    Tang HengYong
    Zhao ChuanLi
    Cheng CongDian
    [J]. SCIENCE IN CHINA SERIES A-MATHEMATICS, 2008, 51 (02): : 273 - 292
  • [47] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    HengYong Tang
    ChuanLi Zhao
    CongDian Cheng
    [J]. Science in China Series A: Mathematics, 2008, 51 : 273 - 292
  • [48] Single Machine Scheduling Problem with Batch Outsourcing
    Safarzadeh, H.
    Kianfar, F.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING, 2022, 35 (05): : 1006 - 1016
  • [49] The CLWS heuristic for single machine scheduling problem
    Soric, K
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (02) : 352 - 358
  • [50] An iterative heuristic for the single machine dynamic total completion time scheduling problem
    Chand, S
    Traub, R
    Uzsoy, R
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (07) : 641 - 651