摘要
A Tidal Power Plant (TPP) is being constructed at the middle part of the existing Sihwa Lake dike located near the southern Incheon Port in Korea. The project, which will continue until 2010, is to harness the largest tidal energy in the Kyeonggi Bay, the eastern Yellow Sea. The present paper outlines the overall project with current progress of construction. The Sihwa TPP when it is completed will have the largest installed capacity so far.
引用
收藏
页码:45 / +
页数:2
相关论文
共 50 条
  • [1] Lake Sihwa tidal power plant project
    Bae, Young Ho
    Kim, Kyeong Ok
    Choi, Byung Ho
    OCEAN ENGINEERING, 2010, 37 (5-6) : 454 - 463
  • [2] The Construction of a Tidal Power Plant at Sihwa Lake, Korea
    Cho, Y. -S.
    Lee, J. W.
    Jeong, W.
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2012, 34 (14) : 1280 - 1287
  • [3] Sihwa Lake Tidal Power Plant, Gyeonggi Province, South Korea
    Patel, Sonal
    POWER, 2015, 159 (12) : 32 - 33
  • [4] Changes in Power Generation at Sihwa Lake Tidal Power Plant with the Installation of Submerged Breakwaters
    Kim, Tae-Woo
    Kim, Yeon-Joong
    Yoon, Jong-Sung
    Kim, Myoung-Kyu
    JOURNAL OF COASTAL RESEARCH, 2021, : 146 - 150
  • [5] Tidal Power Plants - the Example of the Sihwa Power Project
    Grafenberger, Peter
    WASSERWIRTSCHAFT, 2009, 99 (03) : 46 - 49
  • [6] Unbalanced sediment transport by tidal power generation in Lake Sihwa
    Kim, J. W.
    Ha, H. K.
    Woo, S. -B.
    Kim, M. -S.
    Kwon, H. -K.
    RENEWABLE ENERGY, 2021, 172 : 1133 - 1144
  • [7] Effect of intake vortex occurrence on the performance of an axial hydraulic turbine in Sihwa-lake tidal power plant, Korea
    Kim, Jin-Hyuk
    Heo, Man-Woong
    Cha, Kyung-Hun
    Kim, Kwang-Yong
    Tac, Se-Wyan
    Cho, Yong
    Hwang, Jae-Chun
    Collins, Maria
    International Journal of Fluid Machinery and Systems, 2012, 5 (04) : 174 - 179
  • [8] Challenges on Field Testing a Tidal Power Plant to Achieve IEC Conformity - Sihwa Tidal in South Korea
    Leopold, Goetsch
    Collins, Maria
    Angerer, Christian
    Grafenberger, Peter
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,
  • [9] Construction Project of a new Hydroelectric Power Plant in Rheinfelden
    Biesgen, Wolfgang
    WASSERWIRTSCHAFT, 2013, 103 (06) : 3 - 3
  • [10] Measuring the environmental costs of tidal power plant construction: A choice experiment study
    Lee, Joo-Suk
    Yoo, Seung-Hoon
    ENERGY POLICY, 2009, 37 (12) : 5069 - 5074