Risk analysis of flood control operation mode with forecast information based on a combination of risk sources

被引:36
|
作者
Diao YanFang [1 ]
Wang BenDe [1 ]
机构
[1] Dalian Univ Technol, Sch Fac Infrastruct Engn, Dalian 116024, Peoples R China
关键词
flood control operation mode with forecast information; risk analysis; Monte Carlo simulation;
D O I
10.1007/s11431-010-3124-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Risk analysis of reservoir flood control operation mode with forecast information (FCOMFI) is an important basis for the design and implementation of FCOMFI. Most of current researches on this issue are incomplete as they only consider flood forecast errors, but not many other uncertainties in reservoir routing. In order to obtain an integrated risk rate of FCOMFI, this paper analyzes four uncertainties, i.e. hydrological, hydraulic, stage-storage uncertainty and time-delay uncertainty, as well as their probability distributions. On the basis of this analysis, an integrated risk analysis model of FCOMFI for reservoirs and its lower reach is established involving the above-mentioned four uncertainties, and this model is solved by Monte Carlo simulation based on Latin hypercube sampling. The simulation results, with Baiguishan reservoir as the example, show that the integrated risk rates of FCOMFI are less than those of the flood control operation mode without forecast information. This article presents the highest limited water level that satisfies flood control safety requirements of the lower reach.
引用
收藏
页码:1949 / 1956
页数:8
相关论文
共 50 条
  • [21] Risk Analysis of Reservoir Flood Routing Calculation Based on Inflow Forecast Uncertainty
    Li, Binquan
    Liang, Zhongmin
    Zhang, Jianyun
    Chen, Xueqing
    Jiang, Xiaolei
    Wang, Jun
    Hu, Yiming
    WATER, 2016, 8 (11)
  • [22] Perspectives on risk analysis and control for real-time operation of flood control systems
    Chen, Juan
    Zhang, Lu
    Li, Guo-zhi
    Zhong, Ping-an
    WATER SCIENCE AND ENGINEERING, 2024, 17 (04) : 319 - 322
  • [23] Reservoir Risk Operation for Flood Control Under Design Flood Uncertainty
    Guo A.
    Yang D.
    Wang Y.
    Wu B.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2023, 55 (02): : 222 - 231
  • [24] Optimal method to establish joint flood control operation rules with flood forecast information for cascade reservoirs
    Zhang, Gai-Hong
    Wang, Guo-Li
    Zhang, Jing
    Tian, Li
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (01): : 123 - 130
  • [25] Optimal operation of a reservoir for flood control and recharging groundwater and its risk analysis
    Zheng, DF
    Wang, BD
    Dong, SH
    PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON RIVER SEDIMENTATION, VOLS 1-4, 2004, : 997 - 1002
  • [26] A RISK-BASED APPROACH FOR FLOOD-CONTROL OPERATION OF A MULTIPURPOSE RESERVOIR
    JAIN, SK
    YOGANARASIMHAN, GN
    SETH, SM
    WATER RESOURCES BULLETIN, 1992, 28 (06): : 1037 - 1043
  • [27] The Operation Mode and Risk Analysis of Crowdfunding
    Wang Xiwen
    Sun Rui
    Zeng Yucheng
    INNOVATION, ENTREPRENEURSHIP AND STRATEGY IN THE ERA OF INTERNET, 2016, : 745 - 749
  • [28] Floodwater resources utilization based on flood forecast information of reservoir operation chart
    Liu, Zhao
    Huang, Wen-Zheng
    Huang, Qiang
    Zhang, Yong-Yong
    Shuikexue Jinzhan/Advances in Water Science, 2009, 20 (04): : 578 - 583
  • [29] Dynamical Flash Flood Risk Forecast
    Rapant, Petr
    Kolejka, Jaromir
    DYNAMICS IN GISCIENCE, 2018, : 373 - 381
  • [30] Flood Risk Awareness and Preparedness : The Role of Trust in Information Sources
    Samaddar, Subhajyoti
    Misra, Bijay Anand
    Tatano, Hirokazu
    PROCEEDINGS 2012 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2012, : 3099 - 3104