共 50 条
- [1] Timetable-independent design and analysis of railway infrastructure [J]. COMPUTERS IN RAILWAYS V, VOL 1: RAILWAY SYSTEMS AND MANAGEMENT, 1996, : 3 - 12
- [2] Railway infrastructure management using a GIS based integrated approach [J]. TRAFFIC AND TRANSPORTATION STUDIES, 2000, : 240 - 245
- [3] The max-plus algebra approach to railway timetable design [J]. COMPUTERS IN RAILWAYS VI, 1998, 2 : 339 - 350
- [5] The complexity of the timetable-based railway network design problem [J]. NETWORKS, 2024, 83 (02) : 289 - 299
- [7] Integrated Reinforcement Learning and Optimization for Railway Timetable Rescheduling [J]. IFAC PAPERSONLINE, 2024, 58 (10): : 310 - 315
- [8] A Timetable Rescheduling Approach for Railway based on Monte Carlo Tree Search [J]. 2019 IEEE INTELLIGENT TRANSPORTATION SYSTEMS CONFERENCE (ITSC), 2019, : 3738 - 3743
- [10] Integrated Approach to the Design of Wind Farm Infrastructure [J]. 2016 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT-EUROPE), 2016,