Debris-flow risk analysis in a managed torrent based on a stochastic life-cycle performance

被引:34
|
作者
Canovas, J. A. Ballesteros [1 ,2 ]
Stoffel, M. [1 ,2 ,3 ]
Corona, C. [4 ]
Schraml, K. [5 ]
Gobiet, A. [6 ,7 ]
Tani, S. [6 ]
Sinabell, F. [8 ]
Fuchs, S. [5 ]
Kaitna, R. [5 ]
机构
[1] Univ Bern, Inst Geol Sci, Dendrolab Ch, Baltzerstr 1 3, CH-3012 Bern, Switzerland
[2] Univ Geneva, Inst Environm Sci, Climate Change Climate Impacts C3i, 66 Blvd Carl Vogt, CH-1205 Geneva, Switzerland
[3] Univ Geneva, Dept Earth Sci, 13 Rue Maraichers, CH-1205 Geneva, Switzerland
[4] CNRS, UMR6042, Geolab, 4 Rue Ledru, F-63057 Clermont Ferrand, France
[5] Univ Nat Resources & Life Sci, Vienna BOKU, Inst Alpine Hazards, A-1190 Vienna, Austria
[6] Graz Univ, Wegener Ctr Climate & Global Change WegCtr, A-8010 Graz, Austria
[7] Cent Off Meteorol & Geodynam ZAMG, A-1190 Vienna, Austria
[8] Austrian Inst Econ Res, A-1030 Vienna, Austria
关键词
Risk assessment; Life-cycle performance; Check dams; Deterioration; Debris flow; Natural hazard; Wartschenbach; CLIMATE-CHANGE; RAINFALL THRESHOLDS; MASS MOVEMENTS; CHECK DAMS; VULNERABILITY; LANDSLIDES; IMPACTS; FREQUENCY; FAILURE; MODELS;
D O I
10.1016/j.scitotenv.2016.03.036
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Two key factors can affect the functional ability of protection structures in mountains torrents, namely (i) infrastructure maintenance of existing infrastructures (as a majority of existing works is in the second half of their life cycle), and (ii) changes in debris-flow activity as a result of ongoing and expected future climatic changes. Here, we explore the applicability of a stochastic life-cycle performance to assess debris-flow risk in the heavily managed Wartschenbach torrent (Lienz region, Austria) and to quantify associated, expected economic losses. We do so by considering maintenance costs to restore infrastructure in the aftermath of debris flow events as well as by assessing the probability of check dam failure (e.g., as a result of overload). Our analysis comprises two different management strategies as well as three scenarios defining future changes in debris-flow activity resulting from climatic changes. At the study site, an average debris-flow frequency of 21 events per decade was observed for the period 1950-2000; activity at the site is projected to change by +38% to -33%, according to the climate scenario used. Comparison of the different management alternatives suggests that the current mitigation strategy will allow to reduce expected damage to infrastructure and population almost fully (89%). However, to guarantee a comparable level of safety, maintenance costs is expected to increase by 57-63%, with an increase of maintenance costs by ca. 50% for each intervention. Our analysis therefore also highlights the importance of taking maintenance costs into account for risk assessments realized in managed torrent systems, as they result both from progressive and event-related deteriorations. We conclude that the stochastic life-cycle performance adopted in this study represents indeed an integrated approach to assess the long-term effects and costs of prevention structures in managed torrents. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:142 / 153
页数:12
相关论文
共 50 条
  • [21] Debris-flow hazard assessment based on stepwise discriminant analysis and extension theory
    Niu, Cen-Cen
    Wang, Qing
    Chen, Jian-Ping
    Wang, Ke
    Zhang, Wen
    Zhou, Fu-Jun
    [J]. QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2014, 47 (03) : 211 - 222
  • [22] Integrate life-cycle assessment and risk analysis results, not methods
    Linkov I.
    Trump B.D.
    Wender B.A.
    Seager T.P.
    Kennedy A.J.
    Keisler J.M.
    [J]. Nature Nanotechnology, 2017, 12 (8) : 740 - 743
  • [23] Analysis and Estimation on Risk Factors in Engineering Project Life-cycle
    Lin Li
    Fan Li-chu
    Zhuo Wei-dong
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 657 - 661
  • [24] Integrate life-cycle assessment and risk analysis results, not methods
    Linkov, Igor
    Trump, Benjamin D.
    Wender, Ben A.
    Seager, Thomas P.
    Kennedy, Alan J.
    Keisler, Jeffrey M.
    [J]. NATURE NANOTECHNOLOGY, 2017, 12 (08) : 740 - 743
  • [25] Integrating BIM with building performance analysis in project life-cycle
    Jin, Ruoyu
    Zhong, Botao
    Ma, Ling
    Hashemi, Arman
    Ding, Lieyun
    [J]. AUTOMATION IN CONSTRUCTION, 2019, 106
  • [26] Life-cycle costing analysis based on concrete durability
    Cao, Weiqun
    Li, Xiaowei
    Zhao, Tiejun
    [J]. Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 476 - 479
  • [27] A risk-based approach to life-cycle impact assessment
    Assies, JA
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 1998, 61 (1-3) : 23 - 29
  • [28] SIMULATION BASED LIFE-CYCLE ANALYSIS OF A VEHICLE FLEET
    Djokic, Ivan
    Lazic, Ljubomir
    Pavlovic, Aleksandra
    Avdic, Aldina
    [J]. PROCEEDINGS OF THE 2ND LOGISTICS INTERNATIONAL CONFERENCE, 2015, : 216 - 221
  • [29] Property insurance against debris-flow disasters based on risk assessment and the principal–agent theory
    Mingtao Ding
    Fangqiang Wei
    Kaiheng Hu
    [J]. Natural Hazards, 2012, 60 : 801 - 817
  • [30] Bridge maintenance, monitoring, management, risk, life-cycle performance and optimization
    Yokota, Hiroshi
    Frangopol, Dan M.
    Akiyama, Mitsuyoshi
    Tsompanakis, Yiannis
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2022, 18 (10-11) : 1377 - 1378