摘要
The development of a transport infrastructure network is one of the critical factors contributing to the economic growth of regions. However, the challenge to transport infrastructure network extension is to mobilize and allocate limited resources for potential projects that can maximize socio-economic benefits and minimize project risk. Cost-benefit analysis (CBA) is one of the ` common' methods used for project proposal evaluation and it has been applied in a range of fields to provide comparisons. Many scholars have proposed methods, tools, techniques and procedures in CBA, but the current challenge to evaluators is to determine feasible methods for assessments. In addition, the socio-economic factors associated with transport infrastructure projects are varied and may have great impacts on project success. Thus, the need to develop CBA methodology that is able to capture key socio-economic factors and enable practitioners to select methods for project evaluation is crucial. In line with this, a functional design for CBA methodology was used to establish a generic framework with assessment functions. The significance of this paper is to propose a functional design approach to CBA methodology to deal with critical issues regarding assessment method selection. This approach also provides a holistic picture of project evaluation via the main processes of CBA system deployment.
引用
收藏
页码:54 / 59
页数:6
相关论文
共 50 条
  • [31] AN OVERVIEW OF COST BENEFIT ANALYSIS FOR WEEE RECYCLING PROJECTS
    Pacesila, Mihaela
    Ciocoiu, Carmen Nadia
    Colesca, Sofia Elena
    Burcea, Stefan Gabriel
    [J]. PROCEEDINGS OF THE 9TH INTERNATIONAL MANAGEMENT CONFERENCE: MANAGEMENT AND INNOVATION FOR COMPETITIVE ADVANTAGE, 2015, : 321 - 332
  • [32] Benefit-Cost Analysis of Rail Projects: A Commentary
    Schweitzer, Lisa
    [J]. PUBLIC WORKS MANAGEMENT & POLICY, 2011, 16 (02) : 129 - 131
  • [33] Application of the Cost - Benefit Analysis to electrical interconnection projects
    Ameyoud, Aziz
    Benbellil, Abdelmadjid
    [J]. PROCEEDINGS OF 2019 ALGERIAN LARGE ELECTRICAL NETWORK CONFERENCE (CAGRE), 2019, : 170 - 175
  • [34] BENEFIT-COST ANALYSIS OF IRRIGATION PROJECTS IN AUSTRALIA
    DAVIDSON, B
    [J]. JOURNAL OF THE AUSTRALIAN INSTITUTE OF AGRICULTURAL SCIENCE, 1969, 35 (04): : 254 - &
  • [35] BENEFIT-COST-ANALYSIS OF URBAN WATER PROJECTS
    POWERS, TA
    [J]. WATER SUPPLY & MANAGEMENT, 1978, 1 (04): : 371 - 385
  • [36] Performing Cost-Benefit Analysis for Funding Projects
    Morosan-Danila, Lucia
    [J]. 14TH ECONOMIC INTERNATIONAL CONFERENCE: STRATEGIES AND DEVELOPMENT POLICIES OF TERRITORIES: INTERNATIONAL, COUNTRY, REGION, CITY, LOCATION CHALLENGES, 2018, : 396 - 405
  • [37] COST BENEFIT ANALYSIS FOR QUALITY COST REDUCTION PROJECTS FOR AUTOMOTIVE INDUSTRY
    Nicoleta, Neagoe Lavinia
    Vladimir, Marascu Klein
    [J]. MODTECH 2011: NEW FACE OF T.M.C.R., VOL I AND II, 2011, : 749 - 752
  • [38] Different cost performance: different determinants? The case of cost overruns in Dutch transport infrastructure projects
    Cantarelli, C. C.
    van Wee, B.
    Molin, E. J. E.
    Flyvbjerg, B.
    [J]. TRANSPORT POLICY, 2012, 22 : 88 - 95
  • [39] Cost benefit analysis in design for safety
    Fargnoli, M
    Ragone, E
    Tronci, M
    [J]. Design 2004: Proceedings of the 8th International Design Conference, Vols 1-3, 2004, : 1015 - 1020
  • [40] GROUNDWATER CONTAMINATION BENEFIT-COST-ANALYSIS METHODOLOGY
    WOLKA, KK
    ALAUSTIN, T
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1988, 114 (02): : 210 - 222