Modeling of Organic Substances and Ammonia Nitrogen Removal in Vertical Flow Constructed Wetlands

被引:4
|
作者
Malinowski, Pawel [1 ]
Dabrowski, Wojciech [1 ]
机构
[1] Bialystok Tech Univ, Fac Bldg & Environm Sci, Ul Wiejska 45E, PL-15351 Bialystok, Poland
来源
JOURNAL OF ECOLOGICAL ENGINEERING | 2020年 / 21卷 / 01期
关键词
treatment modeling; vertical flow constructed wetlands; reject water; organic substances; ammonia nitrogen; WASTE-WATER;
D O I
10.12911/22998993/115391
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The aim of the research was to determine the possibility of using and adapting regression models for a description of constructed wetland systems treating reject water from aerobic sewage sludge stabilization. The P-k-C* model was investigated along with related models. The research was carried out using reject water from aerobic sewage sludge stabilization in daily wastewater treatment plant (WWTP) belonging to Mlekovita in Wysokie Mazowieckic. The main components of the research installation were two vertical flow constructed wetland beds with passive aeration operating at 0.1 m/d hydraulic load. The following parameters were used for modeling: BOD5, COD, N-NH4+ and temperature. Air temperature was also monitored.
引用
收藏
页码:231 / 237
页数:7
相关论文
共 50 条
  • [21] Nitrogen removal in intermittently aerated vertical flow constructed wetlands: Impact of influent COD/N ratios
    Fan, Jinlin
    Wang, Wengang
    Zhang, Bo
    Guo, Yeye
    Ngo, Huu Hao
    Guo, Wenshan
    Zhang, Jian
    Wu, Haiming
    BIORESOURCE TECHNOLOGY, 2013, 143 : 461 - 466
  • [22] Removal of total nitrogen by Cyperus alternifolius from wastewaters in simulated vertical-flow constructed wetlands
    Cui, Li-Hua
    Ouyang, Ying
    Chen, Yin
    Zhu, Xi-Zhen
    Zhu, Wen-Ling
    ECOLOGICAL ENGINEERING, 2009, 35 (08) : 1271 - 1274
  • [23] Simultaneous removal of vanadium and nitrogen in two-stage vertical flow constructed wetlands: Performance and mechanisms
    Chi, Zifang
    Li, Wenjing
    Zhang, Pengdong
    Li, Huai
    Chemosphere, 2024, 367
  • [24] Comparative evaluations of organic matters and nitrogen removal capacities of integrated vertical-flow constructed wetlands: Domestic and nitrified wastewater treatment
    Chang, Jun J.
    Liang, Kang
    Wu, Su Q.
    Zhang, Sheng H.
    Liang, Wei
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2015, 50 (07): : 757 - 766
  • [25] Processes impacting on benzene removal in vertical-flow constructed wetlands
    Tang, Xianqiang
    Eke, Paul Emeka
    Scholz, Miklas
    Huang, Suiliang
    BIORESOURCE TECHNOLOGY, 2009, 100 (01) : 227 - 234
  • [26] Modeling nitrogen removal in a vertical flow constructed wetland treating directly domestic wastewater
    Morvannou, Ania
    Choubert, Jean-Marc
    Vanclooster, Marnik
    Molle, Pascal
    ECOLOGICAL ENGINEERING, 2014, 70 : 379 - 386
  • [27] Modeling of pollution removal in constructed wetlands with horizontal subsurface flow
    Brasil, Mozart da Silva
    de Matos, Antonio Teixeira
    Silva, Claudio Mudado
    Cecon, Paulo Roberto
    Soares, Antonio Alves
    AGRARTECHNISCHE FORSCHUNG-AGRICULTURAL ENGINEERING RESEARCH, 2007, 13 (02): : 48 - 56
  • [28] Two strategies for advanced nitrogen elimination in vertical flow constructed wetlands
    Laber, J
    Perfler, R
    Haberl, R
    WATER SCIENCE AND TECHNOLOGY, 1997, 35 (05) : 71 - 77
  • [29] Nitrogen removal processes in constructed wetlands
    Tanner, CC
    WETLANDS ECOSYSTEMS IN ASIA: FUNCTION AND MANAGEMENT, 2004, 1 : 331 - 346
  • [30] DESIGNING CONSTRUCTED WETLANDS FOR NITROGEN REMOVAL
    HAMMER, DA
    KNIGHT, RL
    WATER SCIENCE AND TECHNOLOGY, 1994, 29 (04) : 15 - 27