Risk management by geotechnical monitoring for safe excavation of a large rock cavern: a case study

被引:1
|
作者
Bhatkar, T. [1 ]
Mandal, A. [1 ]
Kumar, C. [2 ]
Usmani, A. [2 ]
机构
[1] VNIT Nagpur, Dept Civil Engn, Nagpur 440010, Maharashtra, India
[2] EIB Engineers India Ltd, Sub Surface Project Div, 2nd Floor, New Delhi 110066, India
关键词
Underground excavation; Cavern; Tunnel; Geotechnical monitoring; TUNNEL;
D O I
10.1007/s10064-016-0963-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The present report highlights the methods used to monitor the rock mass behavior and performance of a cavern during excavation in order to verify and, if necessary, adjust the rock support to ensure safe construction at each stage of excavation. The present geotechnical monitoring practice for underground structures involves convergence monitoring with the help of optical targets and rock mass displacement with the help of borehole extensometers. More importantly, it involves detailed planning to finalize the position of each monitoring instrument, based on the location and orientation of geological features. It is equally important to ensure proper recording of monitoring data in order to analyze and take immediate action in case of any adverse situation. This requires dedicated high-end automated software, which can record, analyse and produce significant results from a large quantity of recorded data, to prevent what could otherwise be a catastrophic failure. Initially, geotechnical monitoring was carried out in the recently excavated zone of the cavern on a daily basis. Based on continuous monitoring data for at least 1 week, the frequency of subsequent monitoring can be decided. In most cases, the deformation of rock mass was considerably less than the alarming values which were calculated based on detailed design for different rock classes.
引用
收藏
页码:1209 / 1216
页数:8
相关论文
共 50 条
  • [21] Damage coupled time-dependent model of a jointed rock mass and application to large underground cavern excavation
    Chen, WZ
    Zhu, WS
    Shao, JF
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2004, 41 (04) : 669 - 677
  • [22] Safe excavation of large section tunnels with Earth Pressure Balance Tunnel Boring Machine in gassy rock masses: The Sparvo tunnel case study
    Bandini, Annalisa
    Berry, Paolo
    Cormio, Carlo
    Colaiori, Marco
    Lisardi, Andrea
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 67 : 85 - 97
  • [23] The construction, ground reinforcement, and monitoring of a large cavern in poor rock mass in NW Italy
    Grasso, P
    Rossler, K
    Maccan, S
    Xu, S
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 1007 - 1014
  • [24] STABILITY STUDY FOR A LARGE CAVERN IN SALT ROCK FROM SLANIC PRAHOVA
    Arad, Suzana
    Arad, Victor
    Onica, Ilie
    Oprina, Adrian
    Chipesiu, Florinel
    Mitrica, Bogdan
    Apostu, Ana
    Margineanu, Romul
    ACTA PHYSICA POLONICA B, 2010, 41 (07): : 1789 - 1802
  • [25] Natural Creation of Large Rock Cavern: Can We Construct Them? Jenolan Caves as a Case Study
    Kong, Keith
    Rajabi, Mojtaba
    Karlovsek, Jurij
    APPLIED SCIENCES-BASEL, 2024, 14 (23):
  • [26] Geotechnical and monitoring challenges during excavation of a large urban tunnel in soft ground and low overburden
    Moritz, B.
    Matt, R.
    Heissenberger, R.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1057 - 1063
  • [27] Estimation of measurement results concerning deformation behavior of large-scale rock cavern used as underground museum in excavation
    Chikahisa, H
    Kobayashi, K
    Nakahara, H
    Matsumoto, K
    Tsutsui, M
    Sakurai, S
    NINTH INTERNATIONAL CONGRESS ON ROCK MECHANICS, VOLS 1 & 2, 1999, : 353 - 356
  • [28] Underground cavern excavation using underground bulk explosives-an Indian case study
    Mishra, A. K.
    Rao, K. V. Ramana
    Rao, B. Eswara
    Joshi, Deepak
    PERFORMANCE OF EXPLOSIVES AND NEW DEVELOPMENTS, 2013, : 91 - 96
  • [29] A study on the design of the shallow large rock cavern in the Gonjiam underground storage terminal
    Park, ES
    Kim, HY
    Lee, HK
    ENVIRONMENTAL AND SAFETY CONCERNS IN UNDERGROUND CONSTRUCTION, VOLS, 1 AND 2, 1997, : 345 - 351
  • [30] A relationship-based and object-oriented software for monitoring management during geotechnical excavation
    Wang, Hao
    Li, Li
    Jiao, Yu-Yong
    Ge, Xiu-Run
    Li, Shu-Cai
    ADVANCES IN ENGINEERING SOFTWARE, 2014, 71 : 34 - 45