Seismic Risk Analysis of Iranian Construction Projects

被引:0
|
作者
Shokri-Ghasabeh, M. [2 ]
Bakhshiani, A. [3 ]
Mofid, M. [1 ]
Hansen, K. [4 ]
机构
[1] Sharif Univ Technol, Dept Civil Engn, Tehran, Iran
[2] Univ S Australia, Sch NBE, Adelaide, SA 5000, Australia
[3] Univ Tehran, Fac Engn, Tehran, Iran
[4] Sch Mech Engn, Adelaide, SA 5005, Australia
来源
关键词
Earthquake risk analysis; Construction management; Project management; Risk management; OLS; GLS;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, the project earthquake occurrence risk coefficient is determined for each construction project that is located in one of Iran's twenty seismic regions. This coefficient is allocated, regardless of the current situation of the project, being in the plan or execution phase or even completed. This coefficient indicates the possibility of an earthquake occurrence during a project's life time. To find this coefficient, the Gutenberg-Richter linear relationship has been applied, in conjunction with the Poisson distribution. The Gutenberg-Richter linear equation expresses the relationship between the magnitude of an earthquake and the number of occurrences, during a fixed time, of that magnitude. To find the linear relationship for a series of earthquakes with different magnitudes occurring in the same seismic region, the Ordinary Least square (OLS) has been used. Two linear regression assumption violations, which are variance heteroscedasticity and autocorrelation, have been tested on the available data. In the case of finding one or both of these two violations. The Generalized least Square (GLS) has been applied to produce a better regression line. Moreover, the second order type of the Gutenberg-Richter relationship has also been determined to validate the linear one. In conclusion, by application of the Poisson distribution and by having the design earthquake's magnitude and project life time, the third parameter, which is the design earthquake occurrence risk, can be determined for a given construction project in a specific location in Iran.
引用
收藏
页码:62 / 73
页数:12
相关论文
共 50 条
  • [1] Dynamic risk analysis in construction projects
    Nasirzadeh, Farnad
    Afshar, Abbas
    Khanzadi, Mostafa
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2008, 35 (08) : 820 - 831
  • [2] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [3] Development of Risk Identification and Risk Analysis in Construction Projects
    Shen, JianHong
    Cao, XiuFeng
    [J]. PROCEEDINGS OF THE 16TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE (CRIOCM2011), 2011, : 412 - 415
  • [4] Social network analysis of project procurement in Iranian construction mega projects
    Shabani Ardakani S.
    Nik-Bakht M.
    [J]. Asian Journal of Civil Engineering, 2021, 22 (5) : 809 - 829
  • [5] Delays in the Iranian construction projects: Stakeholders and economy
    Asnaashari, E.
    Knight, A.
    Hurst, A.
    [J]. CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 699 - 704
  • [6] RISK ASSESSMENT THROUGH CONSTRUCTION SEQUENCE ANALYSIS FOR PLANT CONSTRUCTION PROJECTS
    Kim, Jihye
    Choi, Jaehyun
    [J]. SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 495 - 500
  • [7] Performance Analysis of Construction Manager at Risk on Pipeline Engineering and Construction Projects
    Francom, Tober
    El Asmar, Mounir
    Ariaratnam, Samuel T.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (06)
  • [8] Analysis of fraud risk in public construction projects in China
    Deng, Xiaomei
    Wang, Yuhong
    Zhang, Qianqian
    Huang, Judy Xiye
    Cui, Jingjing
    [J]. PUBLIC MONEY & MANAGEMENT, 2014, 34 (01) : 51 - 58
  • [9] Risk analysis on construction of agricultural water conservancy projects
    Wei, Minghua
    Lu, Shibao
    Zheng, Zhihong
    [J]. Nongye Gongcheng Xuebao/Transactions of the Chinese Society of Agricultural Engineering, 2011, 27 (SUPPL. 1): : 233 - 237
  • [10] A New Approach to Analysis of Green Risk in Construction Projects
    Zhang, Xian-feng
    Li, Hui-qiang
    He, Yong-fang
    Liu, Hai-liang
    [J]. EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2248 - 2253