Multi-Objective DG Planning Considering Operational and Economic Viewpoints

被引:0
|
作者
Ameli, Amir [1 ]
Farrokhifard, Mohammadreza [1 ]
Shahsavari, Alireza [1 ]
Ahmadifar, Amir [1 ]
Shayanfar, Heidar-Ali [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Elect Engn, Tehran, Iran
来源
2013 13TH INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING (EEEIC) | 2013年
关键词
distributed generation; fuzzy decesion making; MOPSO; economicy; operational; DISTRIBUTED GENERATION; RELIABILITY; ALLOCATION;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In recent decades, moving towards extensive applications of renewable energy sources instead of traditional fossil ones, distributed generations or DGs have become proper choices to employ in power grids. Although application of these types of supplies have lots of advantages, such as improving the voltage stability, enhancement of the voltage profiles, mitigation of power losses and improvement of grids reliability, however, improper location and size of these units can raise problems in the operation of power systems. Consequently, appropriate selection and location of DG units are of great importance. This paper proposes a novel technique using multi-objective particle swarm optimization (MOPSO) tool for determining DGs sizes and locations to be used by distribution company (DisCo). In this study, the necessary operational and economic objective functions are developed. Then in order to select the best compromised answer from the Pareto optimal set of solutions obtained from the related simulations, a fuzzy decision making method is employed. Finally, the effectiveness of the proposed technique is validated on the IEEE 33-bus distribution test system.
引用
收藏
页码:104 / 109
页数:6
相关论文
共 50 条
  • [1] Multi Objective DG and RPC Planning of Radial type Distribution Network Considering Economic ViewPoints
    Sarvaiya, Jaydeepsinh
    Chudasama, Mahipalsinh
    2017 1ST INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS AND INFORMATION MANAGEMENT (ICISIM), 2017, : 271 - 275
  • [2] Multi-objective transmission network planning considering grid-operational heterogeneity
    Pan, Z. (panzhijun34@163.com), 1600, Electric Power Automation Equipment Press (34):
  • [3] Stochastic multi-objective operational planning of smart distribution systems considering demand response programs
    Zakariazadeh, Alireza
    Jadid, Shahram
    Siano, Pierluigi
    ELECTRIC POWER SYSTEMS RESEARCH, 2014, 111 : 156 - 168
  • [4] Hierarchical Multi-objective Planning for Integrated Energy Systems in Smart Parks Considering Operational Characteristics
    Dong, Weijie
    Zhang, Limei
    Zhang, Dongxia
    Cui, Quansheng
    CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2022, 8 (06): : 1760 - 1771
  • [5] Multi-objective Distribution Network Planning Considering Invulnerability
    Chen, Jueyu
    Peng, Minfang
    Gao, Xiang
    Li, Guangming
    PROCEEDINGS OF 2017 IEEE 2ND INFORMATION TECHNOLOGY, NETWORKING, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (ITNEC), 2017, : 888 - 891
  • [6] Operational Planning in Power Systems Based on Multi-Objective Optimization
    Korovkin N.V.
    Odintsov M.V.
    Frolov O.V.
    Korovkin, N.V. (nikolay.korovkin@gmail.com), 2016, Springer Science and Business Media, LLC (50) : 75 - 78
  • [7] AN INTERACTIVE FUZZY MULTI-OBJECTIVE APPROACH FOR SHORT TERM DG PLANNING
    Jahromi, Majid Esmi
    Ehsan, Mehdi
    Meyabadi, Abbas Fattahi
    Niknam, Tamer
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2012, 8 (06): : 4157 - 4175
  • [8] Multi-objective demand side scheduling considering the operational safety of appliances
    Du, Y. F.
    Jiang, L.
    Li, Y. Z.
    Counsell, J.
    Smith, J. S.
    APPLIED ENERGY, 2016, 179 : 864 - 874
  • [9] Multi-objective planning of distribution network considering network survivability
    Wei, Z. (wzn_nj@263.net), 1600, Automation of Electric Power Systems Press (38):
  • [10] Multi-objective planning of distributed generation considering environmental benefit
    Li, Ran
    Shen, Xue
    Zhong, Chao
    Yang, Tian
    Dianwang Jishu/Power System Technology, 2014, 38 (06): : 1471 - 1478