Bicriteria Scheduling Problem on the Two-Machine Flowshop Using Simulated Annealing

被引:0
|
作者
Mesgarpour, Mohammad [1 ]
Kirkavak, Nureddin [2 ]
Ozaktas, Hakan [3 ]
机构
[1] Univ Southampton, Sch Math, Southampton SO17 1BJ, Hants, England
[2] Eastern Mediterranean Univ, Dept Ind Engn, Famagusta 10, Turkey
[3] Atilim Univ, Dept Ind Engn, TR-06836 Ankara, Turkey
关键词
Bicriteria Scheduling; Flowshop Scheduling; Simulated Annealing; ALGORITHM; MACHINE; OPTIMIZATION; COMPLEXITY; SHOP;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Real life scheduling problems require the decision maker to consider a number of criteria before arriving at any decision. The trade-offs involved in considering several different criteria provide useful insights for the decision maker. Surprisingly, research in the field of multi-objective scheduling has been quite limited when compared to research in single criterion scheduling. The subject of this paper is the bicriteria scheduling problem in a two-machine flowshop. The objective is to find a job sequence that minimizes sum of weighted total flowtime and total tardiness. Based on the problem characteristics, a Simulated Annealing algorithm is developed. The proposed meta-heuristic is compared with the branch and bound enumeration algorithm of the integer programming model as well as a modified version of the well-known NEH algorithm. During these evaluations, the experimental design approach and careful statistical analysis have been used to validate the effectiveness of the simulated annealing approach.
引用
下载
收藏
页码:166 / +
页数:3
相关论文
共 50 条
  • [41] A makespan study of the two-machine flowshop scheduling problem with a learning effect
    Wu, Chin-Chia
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2005, 8 (01): : 13 - 25
  • [42] A two-machine flowshop problem with two agents
    Lee, Wen-Chiung
    Chen, Shiuan-Kang
    Chen, Cheng-Wei
    Wu, Chin-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 98 - 104
  • [43] A two-machine flowshop maximum tardiness scheduling problem with a learning effect
    Chin-Chia Wu
    Wen-Chiung Lee
    Wei-Chieh Wang
    The International Journal of Advanced Manufacturing Technology, 2007, 31 : 743 - 750
  • [44] A two-machine flowshop maximum tardiness scheduling problem with a learning effect
    Wu, Chin-Chia
    Lee, Wen-Chiung
    Wang, Wei-Chieh
    International Journal of Advanced Manufacturing Technology, 2007, 31 (7-8): : 743 - 750
  • [45] Fabrication and assembly scheduling in a two-machine flowshop
    Lin, BMT
    Cheng, TCE
    IIE TRANSACTIONS, 2002, 34 (11) : 1015 - 1020
  • [46] Order acceptance and scheduling in a two-machine flowshop
    Wang, Xiuli
    Xie, Xingzi
    Cheng, T. C. E.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 366 - 376
  • [47] Two-machine flowshop scheduling with a secondary criterion
    T'kindt, V
    Gupta, JND
    Billaut, JC
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (04) : 505 - 526
  • [48] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
  • [49] A note on scheduling the two-machine flexible flowshop
    Cheng, TCE
    Wang, GQ
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (01): : 187 - 190
  • [50] Two-machine flowshop scheduling with availability constraints
    Lee, CY
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 114 (02) : 420 - 429