Detection Model for Unbalanced Bidding in Railway Construction Projects: Considering the Risk of Quantity Variation

被引:9
|
作者
Wu, Xi [1 ]
Xu, Feng [1 ]
机构
[1] Shanghai Jiao Tong Univ, Shanghai Key Lab Digital Maintenance Bldg & Infra, Sch Naval Architecture Ocean & Civil Engn, 800 Dongchuan Rd, Shanghai 200240, Peoples R China
关键词
Detection model; Unascertained measurement theory; Analytic hierarchy process (AHP)-fuzzy; Unbalanced bidding; Quantity variation; Railway construction projects;
D O I
10.1061/(ASCE)CO.1943-7862.0002058
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The application of a unit-price contract is nascent in railway construction projects in China. The investment risks for owners arising from unbalanced bidding in unit-price contracts should be given significant attention. Many models have been developed to help contractors place unbalanced bids, making the work of detecting unbalanced bidding even more difficult, especially the quantity error exploitation type of unbalanced bidding. Most detection models fail to consider the risks of quantity variation, a frequent occurrence in railway construction projects. Accordingly, this study developed a model for detecting unbalanced bidding based on an unascertained measurement theory and a analytic hierarchy process-fuzzy comprehensive evaluation method. The proposed model considers the risks in quantity variations. A hierarchical structure model was established to calculate the risks in quantity variations from different line items. A case study was presented to demonstrate the use of the proposed models for identifying and detecting quantity error exploitation unbalanced bids in railway construction projects. The model proposes a method for detecting the quantity error exploitation type of unbalanced bidding in railway construction projects, and can effectively improve accuracy without requiring a large amount of data from previous projects. (c) 2021 American Society of Civil Engineers.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] "Internet plus "Railway Construction Projects' Creative Purchasing Model
    Liu, Jiaying
    Xu, Lijuan
    [J]. 2016 INTERNATIONAL CONFERENCE ON LOGISTICS, INFORMATICS AND SERVICE SCIENCES (LISS' 2016), 2016,
  • [22] A Proposed Model for Variation Order Management in Construction Projects
    Ismaeil, Esam M. H.
    Sobaih, Abu Elnasr E.
    [J]. BUILDINGS, 2024, 14 (03)
  • [23] An injury risk model for large construction projects
    Søren Spangenberg
    [J]. Risk Management, 2009, 11 : 111 - 134
  • [24] An Integrated Risk Management Model for Construction Projects
    Zhao, Zhen-Yu
    Duan, Lin-Ling
    [J]. 2008 PORTLAND INTERNATIONAL CONFERENCE ON MANAGEMENT OF ENGINEERING & TECHNOLOGY, VOLS 1-5, 2008, : 1389 - 1394
  • [25] An injury risk model for large construction projects
    Spangenberg, Soren
    [J]. RISK MANAGEMENT-AN INTERNATIONAL JOURNAL, 2009, 11 (02): : 111 - 134
  • [26] Risk management system model for construction projects
    Titarenko, Boris
    Hasnaoui, Amir
    Titarenko, Roman
    [J]. XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON ADVANCED IN CIVIL ENGINEERING CONSTRUCTION - THE FORMATION OF LIVING ENVIRONMENT (FORM 2018), 2018, 365
  • [27] A bid decision-making model in the initial bidding phase for overseas construction projects
    Jin-Sub Hwang
    Yea-Sang Kim
    [J]. KSCE Journal of Civil Engineering, 2016, 20 : 1189 - 1200
  • [28] A bid decision-making model in the initial bidding phase for overseas construction projects
    Hwang, Jin-Sub
    Kim, Yea-Sang
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (04) : 1189 - 1200
  • [29] A hybrid mathematical programming model and statistical approach for bidding price decision in construction projects
    Rastegar, Hamid
    Shirani, Behrouz Arbab
    Mirmohammadi, S. Hamid
    Bajegani, Esmaeil Akhondi
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (01) : 1 - 22
  • [30] Detection of schedule delay risk of empirical construction projects
    Gebrehiwet, Tsegay
    Luo, Hanbin
    [J]. FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (02) : 251 - 267