Variations in Channel Centerline Migration Rate and Intensity of a Braided Reach in the Lower Yellow River

被引:18
|
作者
Xia, Junqiang [1 ]
Wang, Yingzhen [1 ]
Zhou, Meirong [1 ]
Deng, Shanshan [1 ]
Li, Zhiwei [1 ]
Wang, Zenghui [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Northwest A&F Univ, Coll Water Resources & Architectural Engn, Yangling 712100, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
channel centerline; migration rate; migration intensity; braided reach; Lower Yellow River; SEDIMENT RATING CURVES; FLUVIAL PROCESSES; YANGTZE-RIVER; GEOMETRY; WATER; WIDTH; ADJUSTMENTS; SIMULATION; FLOODPLAIN; MORPHOLOGY;
D O I
10.3390/rs13091680
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Yellow River (YR) covers three climatic zones including arid region, semi-arid region and temperate monsoon region, with frequent appearance of flow intermittence in the Lower Yellow River (LYR) before 1999. Channel migration occurs frequently in braided rivers, which is a major focus of study in geomorphology and river dynamics. The braided reach in the LYR is featured by a complexly spatio-temporal variation in channel migration parameters owing to the varying condition of flow and sediment. It is crucial to investigate the migration characteristics of channel centerline for the sake of fully understanding channel evolution. A detailed calculation procedure is proposed to quantify migration rates and intensities of channel centerline at section- and reach-scales, using the measurements of remote sensing images and cross-sectional topography. Migration rates and intensities of channel centerline at section- and reach-scales from 1986 to 2016 were calculated, with the characteristics and key factors to control the migration intensity of channel centerline being identified quantitatively. Calculated results indicate that: (i) the mean probability of centerline migrating toward the left side was approximately equal to the probability of rightward migration from a long-term sequence; (ii) the mean reach-scale migration rate of channel centerline was reduced from 410 m/yr in 1986-1999 to 185 m/yr in 1999-2016, with a reduction of 55% owing to the Xiaolangdi Reservoir operation in 1999, and the mean reach-scale migration intensity of channel centerline was decreased from 0.28 to 0.16 m/(yr center dot m), with a reduction of 43%; (iii) the incoming flow-sediment regime was a dominant factor affecting the degree of channel migration, although the channel boundary conditions could influence the intensity of channel migration; and (iv) the reach-scale migration intensity of channel centerline can be written as a power function of the previous two-year average incoming sediment coefficient or fluvial erosion intensity, and the reach-scale migration intensities of channel centerline calculated using the proposed relations are generally in close agreement with the measurements over the period of 30 years.
引用
收藏
页数:21
相关论文
共 50 条
  • [21] Lateral erosion/accretion area and shrinkage rate of the Linhe reach braided channel of the Yellow River between 1977 and 2014
    Wang Suiji
    Mei Yanguo
    JOURNAL OF GEOGRAPHICAL SCIENCES, 2016, 26 (11) : 1579 - 1592
  • [22] Lateral erosion/accretion area and shrinkage rate of the Linhe reach braided channel of the Yellow River between 1977 and 2014
    Suiji Wang
    Yanguo Mei
    Journal of Geographical Sciences, 2016, 26 : 1579 - 1592
  • [23] Response of sediment delivery ratio to the incoming flow-sediment regime and channel geometry in the braided reach of the Lower Yellow River
    Cheng Y.
    Xia J.
    Zhou M.
    Wang Y.
    Dili Xuebao/Acta Geographica Sinica, 2021, 76 (01): : 127 - 138
  • [24] Adjustment of flood discharge capacity with varying boundary conditions in a braided reach of the Lower Yellow River
    CHENG Yifei
    XIA Junqiang
    ZHOU Meirong
    DENG Shanshan
    LI Zhiwei
    Journal of Geographical Sciences, 2021, 31 (11) : 1615 - 1632
  • [25] Adjustment of flood discharge capacity with varying boundary conditions in a braided reach of the Lower Yellow River
    Cheng Yifei
    Xia Junqiang
    Zhou Meirong
    Deng Shanshan
    Li Zhiwei
    JOURNAL OF GEOGRAPHICAL SCIENCES, 2021, 31 (11) : 1615 - 1632
  • [26] Two-dimensional composite mathematical alluvial model for the braided reach in the Lower Yellow River
    Wang, GQ
    Xia, JQ
    Wu, BS
    WATER INTERNATIONAL, 2004, 29 (04) : 455 - 466
  • [27] Adjustment of flood discharge capacity with varying boundary conditions in a braided reach of the Lower Yellow River
    Yifei Cheng
    Junqiang Xia
    Meirong Zhou
    Shanshan Deng
    Zhiwei Li
    Journal of Geographical Sciences, 2021, 31 : 1615 - 1632
  • [28] Coupled two-dimensional model for heavily sediment-laden floods and channel deformation in a braided reach of the Lower Yellow River
    Cheng, Yifei
    Xia, Junqiang
    Zhou, Meirong
    Wang, Zenghui
    APPLIED MATHEMATICAL MODELLING, 2024, 131 : 423 - 437
  • [29] Formative cause of distorted bends in the braided lower Yellow river in the process of channel shrinkage
    Xu, Jiongxin
    Lu, Zhongchen
    Liu, Jixiang
    Nisha Yanjiu/Journal of Sediment Research, 2000, (03): : 36 - 41
  • [30] Characteristics of Channel-Planform Adjustment in the Wandering Reach of the Lower Yellow River
    Zhang, Min
    Huang, He Qing
    Li, Yong
    Zhang, Xiaohua
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2019: HYDRAULICS, WATERWAYS, AND WATER DISTRIBUTION SYSTEMS ANALYSIS, 2019, : 55 - 67