Multistage stochastic inexact chance-constraint programming for an integrated biomass-municipal solid waste power supply management under uncertainty

被引:33
|
作者
Wu, C. B. [1 ]
Huang, G. H. [1 ]
Li, W. [1 ]
Xie, Y. L. [1 ]
Xu, Y. [2 ]
机构
[1] North China Elect Power Univ, SC Resources & Environm Res Acad, MOE Key Lab Reg Energy & Environm Syst Optimizat, Beijing 102206, Peoples R China
[2] Chinese Acad Environm Planning, Beijing 100012, Peoples R China
来源
RENEWABLE & SUSTAINABLE ENERGY REVIEWS | 2015年 / 41卷
基金
加拿大自然科学与工程研究理事会;
关键词
Multistage stochastic programming; Chance-constraint programming; Power supply management; Uncertainty; WATER-RESOURCES MANAGEMENT; MODEL; INCINERATION; SYSTEMS; CHINA; GREENHOUSE; EMISSION; FUZZY;
D O I
10.1016/j.rser.2014.09.019
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this study, a multistage stochastic inexact chance-constraint programming (MSICCP) model is developed for power supply management under uncertainties. In the MSICCP model, methods of multistage stochastic programming (MSP), interval-parameter programming (IPP), and chance-constraint programming (CCP) are introduced into a general optimization framework, such that the developed model can tackle uncertainties described in terms of interval values and probability distribution s over a multistage context. Moreover, it can reflect dynamic and randomness of energy resources during the planning horizon. The developed method has been applied to a case of managing the process of power supply in an integrated biomass-municipal solid waste power plant. Useful solutions for the power supply management have been generated. Interval solutions associated with different risk levels of constraint violation have been obtained. The generated solutions can provide desired energy resource allocation with a minimized system cost, maximized system reliability and a maximized energy security. Tradeoffs between system costs and constraint-violation risks can also be tackled. Higher costs will increase system stability, while a desire for lower system costs will run into a risk of potential instability of the management system. They are helpful for supporting (a) adjustment or justification of allocation patterns of energy resources, and (b) analysis of interactions among economic cost, environmental requirement, and power supply security. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1244 / 1254
页数:11
相关论文
共 37 条
  • [21] An inexact stochastic-fuzzy jointed chance-constrained programming for regional energy system management under uncertainty
    Liu, Zhengping
    Huang, Guohe
    Li, Wei
    ENGINEERING OPTIMIZATION, 2015, 47 (06) : 788 - 804
  • [22] Inexact rough-interval type-2 fuzzy stochastic optimization model supporting municipal solid waste management under uncertainty
    Wang, Li
    Jin, Lei
    ENGINEERING OPTIMIZATION, 2019, 51 (09) : 1567 - 1580
  • [23] A stochastic equilibrium chance-constrained programming model for municipal solid waste management of the City of Dalian, China
    Min Zhou
    Shasha Lu
    Shukui Tan
    Danping Yan
    Guoliang Ou
    Dianfeng Liu
    Xiang Luo
    Yanan Li
    Lu Zhang
    Zuo Zhang
    Xiangbo Zhu
    Quality & Quantity, 2017, 51 : 199 - 218
  • [24] A stochastic equilibrium chance-constrained programming model for municipal solid waste management of the City of Dalian, China
    Zhou, Min
    Lu, Shasha
    Tan, Shukui
    Yan, Danping
    Ou, Guoliang
    Liu, Dianfeng
    Luo, Xiang
    Li, Yanan
    Zhang, Lu
    Zhang, Zuo
    Zhu, Xiangbo
    QUALITY & QUANTITY, 2017, 51 (01) : 199 - 218
  • [25] Municipal solid waste supply chain management under an integrated optimization of sustainability targets
    Saif, Yousef
    Griffiths, Steven
    Almansoori, Ali
    COMPUTERS & CHEMICAL ENGINEERING, 2022, 160
  • [26] An inexact fixed-mix fuzzy-stochastic programming model for heat supply management in wind power heating system under uncertainty
    Wu, C. B.
    Huang, G. H.
    Li, W.
    Zhen, J. L.
    Ji, L.
    JOURNAL OF CLEANER PRODUCTION, 2016, 112 : 1717 - 1728
  • [27] A GRAY LINEAR-PROGRAMMING APPROACH FOR MUNICIPAL SOLID-WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY
    HUANG, GH
    BAETZ, BW
    PATRY, GG
    CIVIL ENGINEERING SYSTEMS, 1992, 9 (04): : 319 - 335
  • [28] GREY QUADRATIC-PROGRAMMING AND ITS APPLICATION TO MUNICIPAL SOLID-WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY
    HUANG, GH
    BAETZ, BW
    ENGINEERING OPTIMIZATION, 1995, 23 (03) : 201 - 223
  • [29] A GRAY FUZZY LINEAR-PROGRAMMING APPROACH FOR MUNICIPAL SOLID-WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY
    HUANG, GH
    BAETZ, BW
    PATRY, GG
    CIVIL ENGINEERING SYSTEMS, 1993, 10 (02): : 123 - 146
  • [30] An Inexact Credibility Chance-Constrained Integer Programming for Greenhouse Gas Mitigation Management in Regional Electric Power System under Uncertainty
    Li, W.
    Bao, Z.
    Huang, G. H.
    Xie, Y. L.
    JOURNAL OF ENVIRONMENTAL INFORMATICS, 2018, 31 (02) : 111 - 122