Business Operation Improvement through Integrated Infrastructure Management

被引:0
|
作者
Casanova, Alberto [1 ]
Castro, Laura M. [1 ]
Blanco-Ferro, Antonio [1 ]
机构
[1] Univ A Coruna, Dept Comp Sci, La Coruna, Spain
来源
关键词
integration; infrastructure management; legacy; COTS;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The constant emergence of new technologies that improve existing ones in one way or another, creates a permanent need to incorporate innovative tools and components into the existing business ecosystem of legacy components, which cannot be discarded and need to be maintained. This paper presents an integration effort between heterogeneous architectures that goes beyond the traditional on-demand integration and creates an infrastructure management framework to give support to present and future integrations. This effort has allowed the interaction between legacy infrastructure, namely IBM Mainframes, and state-of-the-art applications, platforms, and configuration management technologies, also allowing a better management of the available resources. The integration project, called S.G.I.I. (Sistema de Gestion Integrada de Infraestructura, Integrated Infrastructure Management System) is a solution developed for a real business environment: the Spanish bank NCG Banco. The framework is based on two complementary modules: a front-end, designed over a Microsoft Internet Information Server that provides a means of communication between external applications and the IBM Mainframe; and a back-end, developed over the IBM Mainframe to allow the management of its own resources.
引用
收藏
页码:158 / 165
页数:8
相关论文
共 50 条
  • [31] Towards Implementation of an Integrated Clone Management Infrastructure
    Zibran, Minhaz F.
    [J]. 2016 IEEE 23RD INTERNATIONAL CONFERENCE ON SOFTWARE ANALYSIS, EVOLUTION, AND REENGINEERING (SANER), VOL 3, 2016, : 60 - 61
  • [32] Technological information infrastructure for batch process operation management
    Aoyama, A
    Naka, Y
    Batres, R
    [J]. KAGAKU KOGAKU RONBUNSHU, 2003, 29 (01) : 39 - 46
  • [33] A curriculum model for IT infrastructure management in undergraduate business schools
    Yang, Samuel C.
    [J]. JOURNAL OF EDUCATION FOR BUSINESS, 2018, 93 (07) : 303 - 313
  • [34] Business process improvement workbook: Documentation, analysis, design, and management of business process improvement
    Klefsjo, B
    [J]. QUALITY PROGRESS, 1998, 31 (06) : 110 - 110
  • [35] Framework of business intelligence systems for infrastructure design and management
    Jaffari, Rabeea
    Memon, Mohsin
    Hafiz, Tahseen
    Iftikhar, Rabia
    [J]. 2017 FIRST INTERNATIONAL CONFERENCE ON LATEST TRENDS IN ELECTRICAL ENGINEERING AND COMPUTING TECHNOLOGIES (INTELLECT), 2017,
  • [36] Alternative business models for flood risk management infrastructure
    Walsh, Claire
    Burke, Steven
    Glendinning, Stephanie
    Dawson, Richard
    [J]. 3RD EUROPEAN CONFERENCE ON FLOOD RISK MANAGEMENT (FLOODRISK 2016), 2016, 7
  • [37] A Solution for Integrated Manufacturing Operation Management
    Filipov, Vladimir
    Christova, Nikolinka
    [J]. 2008 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE FOR MODELLING CONTROL & AUTOMATION, VOLS 1 AND 2, 2008, : 527 - +
  • [38] A Business Process Management Infrastructure of Ertan Hydropower Company
    Gao Tian-peng
    [J]. 2009 INTERNATIONAL CONFERENCE ON NETWORKING AND DIGITAL SOCIETY, VOL 2, PROCEEDINGS, 2009, : 107 - 110
  • [39] Approach for integrated operation and management of networks
    Sakano, H
    Shimizu, Y
    Naruse, H
    Itoh, K
    Norimatsu, A
    Fujita, H
    [J]. NEC RESEARCH & DEVELOPMENT, 1998, 39 (04): : 528 - 533
  • [40] Information management integrated to business strategies
    Ferreira Fidelis, Joubert Roberto
    Candido, Cristiane Missias
    [J]. PERSPECTIVAS EM CIENCIA DA INFORMACAO, 2006, 11 (03): : 424 - 432