The reliability study of Gili Trawangan photovoltaic system using RBD (Reliability Block Diagram) method

被引:0
|
作者
Syamsuddin, A. [1 ]
机构
[1] PT PLN Persero, Res Inst, Jl Duren Tiga 102, Jakarta, Indonesia
关键词
D O I
10.1088/1757-899X/1098/4/042051
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In order for Gili Trawangan On-grid photovoltaic (PV) system to be reliable in supplying electricity, it is necessary to know the reliability of the main equipment in the PV system. The aim of this study is to determine the reliability of the main equipment of the on-grid PV system. The methodology is, collecting primary data in the form of disturbance data reports on Gili Trawangan PV system in 2011-2018, compiling the Reliability Block Diagram (RBD) of the PV system and determining the reliability and critical of the PV system equipment using Reliasoft Blocksim software version 11. The On-grid PV systems Reliability Block Diagram consists of 3 sub-systems; Source system, String Combiner System and Power Conditioning System, each of which is composed of main components. RBD simulation results with Reliasoft Blocksim software obtained the results that the reliability of the On-grid PV system is 49% at t=100 hours and 40% at t=300 hours, this condition is still far from the target of PV system reliability of 80%. From the simulation also obtained critical equipment on the On-grid PV system is an AC Inverter and Breaker component, which has a high Reliability Importance (RI) value and with the highest reliability value.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] Optimizing Regression Testing with Functional Flow Block Reliability Diagram
    Chourey, Vaishali
    Sharma, Meena
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON EVALUATION OF NOVEL APPROACHES TO SOFTWARE ENGINEERING (ENASE), 2019, : 526 - 532
  • [42] Calculating block diagram reliability: Parallel industrial objects with backup
    Mushtaev V.I.
    Nesvizhskii F.A.
    Shubin V.S.
    Lozovaya N.P.
    Chemical and Petroleum Engineering, 2004, 40 (11-12) : 758 - 761
  • [43] Reliability evaluation of direct current gathering system in onshore wind farm based on reliability block diagram-sequential monte carlo
    Bai, Xueyan
    Fan, Yanfang
    Hou, Junjie
    Sun, Yao
    Liu, Yujia
    Liu, Junyi
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2024, 40
  • [44] Conjoint modelling with extended coloured Stochastic Petri net and reliability block diagram for system analysis
    Pozsgai, P
    Bertsche, B
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1382 - 1387
  • [45] A new approach to Modeling the system reliability: Dynamic reliability block diagrams
    Distefano, Salvatore
    Xing, Liudong
    2006 PROCEEDINGS - ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, VOLS 1 AND 2, 2006, : 189 - +
  • [46] Defining requirements for improved photovoltaic system reliability
    Maish, A
    PROGRESS IN PHOTOVOLTAICS, 1999, 7 (03): : 165 - 173
  • [47] Estimation of Photovoltaic System Reliability and Performance Metrics
    Dhople, Sairaj V.
    Dominguez-Garcia, Alejandro D.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (01) : 554 - 563
  • [48] Defining requirements for improved photovoltaic system reliability
    Photovoltaic Syst. Applic. Dept., Sandia National Laboratories, Albuquerque, NM, United States
    不详
    Prog Photovoltaics Res Appl, 3 (165-173):
  • [49] RELIABILITY AND AVAILABILITY ANALYSIS OF A FIELDED PHOTOVOLTAIC SYSTEM
    Collins, Elmer
    Dvorack, Michael
    Mahn, Jeff
    Mundt, Michael
    Quintana, Michael
    2009 34TH IEEE PHOTOVOLTAIC SPECIALISTS CONFERENCE, VOLS 1-3, 2009, : 2261 - 2266
  • [50] Solar Photovoltaic System Design and its Reliability
    Sharma, Renu
    Goel, Sonali
    2015 IEEE POWER, COMMUNICATION AND INFORMATION TECHNOLOGY CONFERENCE (PCITC-2015), 2015, : 155 - 159