Design for an Early Warning Index System of the Risk in Logistics Operation

被引:1
|
作者
Zhang, Guohua [1 ]
Dou, Hairong [1 ]
机构
[1] Hebei Univ Sci & Technol, Sch Econ & Management, Shijiazhuang, Peoples R China
关键词
Early Warning; Index System; Logistics Operation; Risk;
D O I
10.1109/ECBI.2009.91
中图分类号
F [经济];
学科分类号
02 ;
摘要
Early warning index system of the risk in logistics operation is the core of the management of early warning for the risks in logistics operation as well as a basis on which overall evaluation model of the logistics operation risk is built. Early warning index system of the risk in logistics operation is made of 6 second-level indexes. They are procurement risk, storage risk, transport risk, loading and carry operations risk, flow and processing risk, and logistics information risk, including 19 third-level indexes.
引用
收藏
页码:217 / 220
页数:4
相关论文
共 50 条
  • [21] Analysis on the Early Warning Index System of Financial Risk of New Energy Enterprises
    Shao, Shanshan
    [J]. 2018 4TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION, 2019, 252
  • [22] Study on Risk Early Warning System of Asphalt Concrete Pavement Design
    Zhou Zhi
    Dai Chong-si
    Guo Song-ying
    [J]. 2013 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2013, : 2093 - 2099
  • [23] Intelligent Early Warning System of Operation Risk of Bridge-Tunnel Transition Section
    Xiao, Dianliang
    Zhou, Zichu
    Fang, Yong
    Guo, Zhongyin
    [J]. 2017 4TH INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS), 2017, : 589 - 594
  • [24] Stochastic design of an early warning system
    Medina-Cetina, Zenon
    Nadim, Farrokh
    [J]. GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2008, 2 (04) : 223 - 236
  • [25] Early-warning management of inner logistics risk in SMEs based on label-card system
    Xie, Kefan
    Liu, Jieming
    Peng, Huatao
    Chen, Gang
    Chen, Yun
    [J]. PRODUCTION PLANNING & CONTROL, 2009, 20 (04) : 306 - 319
  • [26] Design of a project risk warning system
    Yang, Zhaojun
    [J]. ICIM 2006: Proceedings of the Eighth International Conference on Industrial Management, 2006, : 1028 - 1033
  • [27] On Early Warning Evaluation Index System of Enterprise Purchasing Risk Based on the Balanced Scorecard
    Liu, Yongsheng
    Ma, Chunlei
    [J]. INNOVATIVE COMPUTING AND INFORMATION, ICCIC 2011, PT I, 2011, 231 : 471 - 477
  • [28] Risk Early Warning Index System in the Field of Public Safety in Big Data Era
    Cui, Dongmei
    [J]. PROCEEDINGS 2015 SIXTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS ISDEA 2015, 2015, : 704 - 707
  • [29] An Index for the Early Warning of Nodal Outage Risk of Transmission System by Data Driven Method
    Ren, Hui
    Liu, Haoran
    Wang, Genwang
    Wang, Fei
    [J]. 2020 IEEE STUDENT CONFERENCE ON ELECTRIC MACHINES AND SYSTEMS (SCEMS 2020), 2020, : 652 - 657
  • [30] Design for Early Warning Indexes System of Enterprise Internationalized Business Reputation Risk
    Zhang, Guohua
    Yang, Jing
    [J]. 2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 433 - +