摘要
Determining optimal transmission entry capacity (TEC) is very crucial for ensuring an optimal usage of transmission network. It is a complex process to determine the correct TEC levels due to high amount of factors involved. A number of policies encourages the penetration of renewable energy sources with special focus on wind and solar power. Due to intermittent nature of wind energy, the process of determining TEC levels gets ever more complex. Besides, the increasing complexity of finding the optimum TEC levels for generators, another problem is that dispatch of conventional generators are affected by wind power productions. Therefore, the dispatch of all generators become uncertain due to uncertain nature of wind. In this conditions, the optimal usage of the transmission network is very important for efficient operation of the electricity markets. The aim of this paper is to find the optimal TEC levels for electricity generating firms. It uses linear optimisation model and mixed integer linear programming model for non-firm and firm dispatch conditions respectively. The derived models are applied to the IEEE 24-Node test system.
引用
收藏
页码:1467 / 1473
页数:7
相关论文
共 50 条
  • [1] Optimal transmission access for generators in wind-integrated power systems: stochastic and robust programming approaches
    Uzuncan, Ezgi
    Hesamzadeh, Mohammad Reza
    Balkwill, Andy
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2017, 11 (06) : 1345 - 1359
  • [2] Risk Control of Transmission Line Overload for Wind-Integrated Power Systems
    李雪
    路攀
    王春亮
    [J]. Journal of Donghua University(English Edition), 2014, 31 (02) : 124 - 127
  • [3] Risk control of transmission line overload for wind-integrated power systems
    [J]. Lu, P. (lupanluyong@163.com), 1600, (31):
  • [4] A probabilistic approach for optimal operation of wind-integrated power systems including UPFC
    Rezaeian-Marjani, Saeed
    Jalalat, Sajjad Miralizadeh
    Tousi, Behroz
    Galvani, Sadjad
    Talavat, Vahid
    [J]. IET RENEWABLE POWER GENERATION, 2023, 17 (03) : 706 - 724
  • [5] The Calibrated Safety Constraints Optimal Power Flow for the Operation of Wind-Integrated Power Systems
    Lu, Kai-Hung
    Qian, Wenjun
    Jiang, Yuesong
    Zhong, Yi-Shun
    [J]. Processes, 2024, 12 (10)
  • [6] Retrofit Control of Wind-Integrated Power Systems
    Sadamoto, Tomonori
    Chakrabortty, Aranya
    Ishizaki, Takayuki
    Imura, Jun-ichi
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (03) : 2804 - 2815
  • [7] Operating Risk Analysis of Wind-integrated Power Systems
    Karki, Rajesh
    Thapa, Suman
    Billinton, Roy
    [J]. ELECTRIC POWER COMPONENTS AND SYSTEMS, 2012, 40 (04) : 399 - 413
  • [8] Multi-objective linearised optimal reactive power dispatch of wind-integrated transmission networks
    Mahzouni-Sani, Mahdi
    Hamidi, Amir
    Nazarpour, Daryoush
    Golshannavaz, Sajjad
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2019, 13 (13) : 2686 - 2696
  • [9] Exercise of Market Power on Ramp Rate in Wind-Integrated Power Systems
    Moiseeva, Ekaterina
    Hesamzadeh, Mohammad Reza
    Biggar, Darryl R.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (03) : 1614 - 1623
  • [10] A Comprehensive Review on Voltage Stability in Wind-Integrated Power Systems
    Malik, Farhan Hameed
    Khan, Muhammad Waleed
    Rahman, Tauheed Ur
    Ehtisham, Muhammad
    Faheem, Muhammad
    Haider, Zunaib Maqsood
    Lehtonen, Matti
    [J]. ENERGIES, 2024, 17 (03)