Inventory Control for Remanufacturing System wiith Stochastic Product Returns

被引:2
|
作者
Gan, Shuyuan [1 ]
Su, Chun [1 ]
机构
[1] Southeast Univ, Sch Mech Engn, Nanjing 211189, Peoples R China
关键词
Cost model; inventory control; mathematical method; remanufacturing; stochastic product returns; RECOVERY POLICY; MODEL;
D O I
10.1109/ICIEEM.2009.5344478
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The remanufacturing is regarded as a resource-saving and environment-friendly industry. However, inventory control for remanufacturing is facing great challenge caused by uncertainty of product returns, demands and repairing process. In this paper, a single-product remanufacturing system is analyzed and the research of effect caused by stochastic product returns is especially focused on. A kind of pull policy considering the unserviceable inventory and serviceable inventory together is employed. A cost model, the expected value of average single-cycle cost (EASC), is constructed under certain environmental assumptions. The objection is to minimize the EASC by controlling two variables, the serviceable inventory's supplement batch and the remanufacturing product batch. The problem is solved by mathematical method.
引用
收藏
页码:802 / 807
页数:6
相关论文
共 50 条
  • [31] Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system
    Chung, Chun-Jen
    Wee, Hui-Ming
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 195 - 203
  • [32] Research on the Modeling of Inventory Control with Independent Stochastic Item Returns
    He, Bingjie
    Yue, Yujing
    Cai, Xinzhong
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 236 - 239
  • [33] Contingent control of inventory under stochastic supply disruptions and returns
    School of Control Science and Engineering, Shandong University, Jinan
    250061, China
    Zidonghua Xuebao Acta Auto. Sin., 1 (94-103):
  • [34] Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns
    Tang, O
    Grubbström, RW
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 93-4 : 285 - 300
  • [35] Stochastic model predictive control for remanufacturing system management
    Li, Xingyu
    Li, Nan
    Kolmanovsky, Ilya
    Epureanu, Bogdan I.
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 59 : 355 - 366
  • [36] Performance Analysis and Optimization of Remanufacturing Systems with Stochastic Returns
    Xiao, Guoxian
    Jin, Xiaoning
    Chang, Qing
    Biller, Stephan
    Ni, Jun
    Hu, S. Jack
    PROCEEDINGS OF THE ASME INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2012, 2012, : 1041 - 1047
  • [37] Modeling and analysis of a product substitution strategy for a stochastic manufacturing/remanufacturing system
    Ahiska, S. Sebnem
    Kurtul, Emre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 1 - 11
  • [38] The Value of Sampling Inspection in a Single-Period Remanufacturing System with Stochastic Returns Yield
    Zikopoulos, Christos
    Panagiotidou, Sofia
    Nenes, George
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: NEW CHALLENGES, NEW APPROACHES, 2010, 338 : 128 - 135
  • [39] Modelling product returns in inventory control - exploring the validity of general assumptions
    de Brito, MP
    Dekker, R
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 : 225 - 241
  • [40] Two-echelon stochastic inventory system with returns and partial backlogging
    Lin, Hsien-Jen
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2015, 46 (06) : 966 - 975