Building portfolio seismic loss assessment using the First-Order Reliability Method

被引:21
|
作者
Bonstrom, Holly [1 ]
Corotis, Ross B. [1 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
基金
美国国家科学基金会;
关键词
Reliability; Portfolio; Earthquake; Building; Retrofit; Community; Seismic; AVERAGE HORIZONTAL COMPONENT; GROUND-MOTION; SPECTRAL VALUES; MODEL; REDUCTION; RISK;
D O I
10.1016/j.strusafe.2014.09.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The aggregate loss to a portfolio of buildings given a seismic event is of interest to parties such as insurance companies, developers, political organizations and community planners. Regional level estimations tend to be more complex than site-specific assessments due to the correlation that exists between the performances of spatially distributed buildings within a single hazard. This paper presents a new reliability-based approach to quantify seismic risk for a portfolio of buildings, while incorporating this correlation. The proposed framework uses the First-Order Reliability Method (FORM) to evaluate a probability distribution of loss for a suite of spatially distributed buildings. It is applied to a San Francisco neighborhood building inventory to estimate the distribution of total repair cost given a scenario earthquake and prioritize cost-effective retrofit schemes in terms of reducing portfolio loss. The information provided by using the proposed method is expected to facilitate more efficient risk management and mitigation decision-making. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:113 / 120
页数:8
相关论文
共 50 条
  • [21] Fast Precision Margin with the First-Order Reliability Method
    del Rosario, Zachary
    Iaccarino, Gianluca
    Fenrich, Richard W.
    AIAA JOURNAL, 2019, 57 (11) : 5042 - 5053
  • [22] Reliability analysis in fracture mechanics using the first-order reliability method and Monte Carlo simulation
    Puatatsananon, W.
    Saouma, V. E.
    FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, 2006, 29 (11) : 959 - 975
  • [23] First-order reliability method for probabilistic liquefaction triggering analysis using CPT
    Juang, CH
    Fang, SY
    Khor, EH
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2006, 132 (03) : 337 - 350
  • [24] Improvement in first-order reliability method using an adaptive chaos control factor
    Roudak, Mohammad Amin
    Shayanfar, Mohsen Ali
    Karamloo, Mohammad
    STRUCTURES, 2018, 16 : 150 - 156
  • [25] System factors using first-order reliability methods
    Bulleit, WM
    Liu, WF
    BUILDING AN INTERNATIONAL COMMUNITY OF STRUCTURAL ENGINEERS, VOLS 1 AND 2, 1996, : 786 - 791
  • [26] First-order reliability analysis of public health risk assessment
    Hamed, MM
    RISK ANALYSIS, 1997, 17 (02) : 177 - 185
  • [27] The first-order time-variant reliability expansion method
    Chen, Weiwei
    Ni, Bingyu
    Tian, Wanyi
    Jiang, Chao
    STRUCTURAL SAFETY, 2024, 109
  • [28] Hybrid particle swarm optimization for first-order reliability method
    Wang, Gang
    Ma, Zhenyue
    COMPUTERS AND GEOTECHNICS, 2017, 81 : 49 - 58
  • [29] First-order third-moment reliability method - Discussion
    Sadovsky, Z
    Pales, D
    STRUCTURAL SAFETY, 1996, 17 (04) : 255 - 257
  • [30] First-order reliability method to problems involving multimodal distributions
    Xinpeng Wei
    Zhongyang Yao
    Zhe Zhang
    Chao Jiang
    Structural and Multidisciplinary Optimization, 2023, 66