Building portfolio seismic loss assessment using the First-Order Reliability Method

被引:21
|
作者
Bonstrom, Holly [1 ]
Corotis, Ross B. [1 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
基金
美国国家科学基金会;
关键词
Reliability; Portfolio; Earthquake; Building; Retrofit; Community; Seismic; AVERAGE HORIZONTAL COMPONENT; GROUND-MOTION; SPECTRAL VALUES; MODEL; REDUCTION; RISK;
D O I
10.1016/j.strusafe.2014.09.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The aggregate loss to a portfolio of buildings given a seismic event is of interest to parties such as insurance companies, developers, political organizations and community planners. Regional level estimations tend to be more complex than site-specific assessments due to the correlation that exists between the performances of spatially distributed buildings within a single hazard. This paper presents a new reliability-based approach to quantify seismic risk for a portfolio of buildings, while incorporating this correlation. The proposed framework uses the First-Order Reliability Method (FORM) to evaluate a probability distribution of loss for a suite of spatially distributed buildings. It is applied to a San Francisco neighborhood building inventory to estimate the distribution of total repair cost given a scenario earthquake and prioritize cost-effective retrofit schemes in terms of reducing portfolio loss. The information provided by using the proposed method is expected to facilitate more efficient risk management and mitigation decision-making. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:113 / 120
页数:8
相关论文
共 50 条
  • [1] Optimising portfolio loss reduction using a first-order reliability method sensitivity analysis
    Bonstrom, Holly
    Corotis, Ross B.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2015, 11 (09) : 1190 - 1198
  • [2] Application of first-order reliability method in seismic loss assessment of structures with Endurance Time analysis
    Basim, Mohammad Ch.
    Estekanchi, Homayoon E.
    Mahsuli, Mojtaba
    EARTHQUAKES AND STRUCTURES, 2018, 14 (05) : 437 - 447
  • [3] First-Order Reliability Approach to Quantify and Improve Building Portfolio Resilience
    Bonstrom, Holly
    Corotis, Ross B.
    JOURNAL OF STRUCTURAL ENGINEERING, 2016, 142 (08)
  • [4] Reliability Estimation of Buried Pipelines Using First-Order Reliability Method
    Lee, O. S.
    Kim, D. H.
    Myoung, N. H.
    JOURNAL OF THERMOPLASTIC COMPOSITE MATERIALS, 2011, 24 (03) : 303 - 315
  • [5] Reliability sensitivity based on first-order reliability method
    Yanfang, Z.
    Yanlin, Z.
    Yimin, Z.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2011, 225 (C9) : 2189 - 2197
  • [6] Reliability Estimation of the Pultrusion Process Using the First-Order Reliability Method (FORM)
    Baran, Ismet
    Tutum, Cem C.
    Hattel, Jesper H.
    APPLIED COMPOSITE MATERIALS, 2013, 20 (04) : 639 - 653
  • [7] Reliability analysis of tunnels using an adaptive RBF and a first-order reliability method
    Wang, Qian
    Fang, Hongbing
    COMPUTERS AND GEOTECHNICS, 2018, 98 : 144 - 152
  • [8] Reliability Estimation of the Pultrusion Process Using the First-Order Reliability Method (FORM)
    Ismet Baran
    Cem C. Tutum
    Jesper H. Hattel
    Applied Composite Materials, 2013, 20 : 639 - 653
  • [9] System performance assessment of final repository for radioactive wastes using first-order reliability method
    Jong Soon Song
    Kun Jai Lee
    Waste Management, 1992, 12 (04) : 323 - 335
  • [10] An accuracy analysis method for first-order reliability method
    Chen, Zhenzhong
    Wu, Zihao
    Li, Xiaoke
    Chen, Ge
    Chen, Guangfeng
    Gao, Liang
    Qiu, Haobo
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2019, 233 (12) : 4319 - 4327