An optimal integrated production and maintenance strategy for a multi-wind turbines system

被引:19
|
作者
Hajej, Zied [1 ]
Nidhal, Rezg [1 ]
Anis, Chelbi [2 ]
Bouzoubaa, Maryem [1 ]
机构
[1] Lorraine Univ, Dept Mech Technol, LGIPM Lab, UFR MIM, Metz, France
[2] Univ Tunis, Dept Mech, CEREP, ENSIT, Tunis, Tunisia
关键词
renewable energy; wind turbine; energy production; integrated maintenance; optimisation; reliability; PREVENTIVE MAINTENANCE; OPTIMIZATION; PERFORMANCE; MODEL;
D O I
10.1080/00207543.2019.1680897
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents an optimal integrated production and maintenance strategy for a wind farm. A cost model is developed in order to determine sequentially the optimal plan of energy production characterised by the number of working wind turbines and their production rates, and the optimal preventive maintenance policy to be adopted. We model the relationship between the variation of energy production rates and the failure rate of the wind turbines. A numerical example and a sensitivity analysis are presented and the obtained results are discussed.
引用
收藏
页码:6417 / 6440
页数:24
相关论文
共 50 条
  • [31] Optimal production and inspection strategy of an integrated economic model for imperfect production system
    Lin, Ya-Hui
    Lin, Tse-Chieh
    [J]. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2012, 15 (4-5): : 543 - 559
  • [32] An integrated production/quality/maintenance strategy for an unreliable production system: case of perishable products
    Radhoui, Mehdi
    Mhedhbi, Wided
    Chelbi, Anis
    Rezg, Nidhal
    [J]. PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, 2011, : 1040 - 1049
  • [33] Combined Control Strategy for Frequency Regulation of Multi-wind Farms Connected to Multi-terminal Flexible DC
    Lang Y.
    Yang D.
    Yang X.
    Wen B.
    Zhao K.
    [J]. Dianwang Jishu/Power System Technology, 2019, 43 (12): : 4468 - 4477
  • [34] INTEGRATED CONDITION MONITORING FOR WIND TURBINES - THE NIMO SYSTEM
    Papaelias, Mayorkinos
    [J]. 8TH INTERNATIONAL CONFERENCE ON CONDITION MONITORING AND MACHINERY FAILURE PREVENTION TECHNOLOGIES 2011, VOLS 1 AND 2, 2011, : 2 - 2
  • [35] Reliability-Centered Asset Management of Wind Turbines - A Holistic Approach for a Sustainable and Cost-Optimal Maintenance Strategy
    Geiss, Christian
    Guder, Susanne
    [J]. 2017 2ND INTERNATIONAL CONFERENCE ON SYSTEM RELIABILITY AND SAFETY (ICSRS), 2017, : 160 - 164
  • [36] A reactive multi-component maintenance policy for offshore wind turbines
    Zhu, W.
    Fouladirad, M.
    Berenguer, C.
    [J]. SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 811 - 817
  • [37] An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy
    Da Wen
    Pan Ershun
    Wang Ying
    Liao Wenzhu
    [J]. Journal of Intelligent Manufacturing, 2016, 27 : 1323 - 1333
  • [38] An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy
    Da Wen
    Pan Ershun
    Wang Ying
    Liao Wenzhu
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (06) : 1323 - 1333
  • [39] An Optimal Integrated Maintenance to production with Carbon Emission for a Closed-loop System
    Bouslikhane, S.
    Hajej, Z.
    Rezg, N.
    [J]. 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 177 - 182
  • [40] An integrated production, inventory and preventive maintenance model for a multi-product production system
    Liu, Xuejuan
    Wang, Wenbin
    Peng, Rui
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 137 : 76 - 86