Power optimization and economic evaluation of thermoelectric waste heat recovery system around a rotary cement kiln

被引:59
|
作者
Mirhosseini, Mojtaba [1 ]
Rezania, Alireza [1 ]
Rosendahl, Lasse [1 ]
机构
[1] Aalborg Univ, Dept Energy Technol, Pontoppidanstr 111, DK-9220 Aalborg, Denmark
关键词
Cement rotary kiln; Waste heat recovery; Thermoelectric system; Theoretical modelling; Design optimization; Total investment cost; LINKING MATERIAL PROPERTIES; EXHAUST SYSTEMS; GENERATORS; DESIGN;
D O I
10.1016/j.jclepro.2019.06.011
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Cement rotary kiln is the main device utilized for industrial cement production in large scale. The shell temperature can reach several hundred Celsius degrees. Therefore, a thermoelectric waste heat recovery system can be utilized based on its advantages. In this study, an arc shaped absorber is designed and temperature distribution along the absorber circumference is obtained numerically. The calculated temperature is considered as the hot side temperature of thermoelectric generators (TEGs) that recover thermal energy on the absorber. In situations where the heat is free, the metric for designing a thermoelectric system is to reach the maximum power output. In order to reach regional optimal power from parametric design, the absorber length is divided into several sections. For efficient design of the TEG in each section, effect of significant parameters such as leg length and fill factor of the TEG and thermal resistance of the heat sink are studied. Effect of variation of the temperature and velocity magnitudes of the air next to the heat sinks is considered on thermal resistance and performance of the pin-fin heat sinks along the absorber. beta-phase zinc antimonide (Zn4Sb3) and magnesium tin silicide (Mg2SiSn) are chosen as the p- and n-leg thermoelectric materials of the TEGs, respectively, because of their relatively high performance over the considered range of operating temperature. The results show that, staggered arrangement of the pin-fins is more effective for higher power generation and system performance compared to in-line arrangement of the fins. Moreover, by evaluation of the results, maximum matched power output in each section versus the fill factor and leg length can be determined in this study. The results show that, low fill factors between 0.05 and 0.2 can provide relatively a same maximum power as high fill factors. Furthermore, an economic evaluation is carried out to find optimal design of the TEG device for highest power generation and lowest investment cost. Various parameters of the cost function, such as cost of the bulk raw material (CB), manufacturing cost associated with processing bulk material (C-M,C-B), areal manufacturing cost (C-M,C-A), heat exchanger cost (CH-Ex), balance of the system cost (C-BoS) and the installation cost (C-l) are taken into account in this study. The results show dominant parameter in the system cost is the heat sink. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1321 / 1334
页数:14
相关论文
共 50 条
  • [31] Thermo-economic analysis and optimization of a combined cooling and power (CCP) system for engine waste heat recovery
    Xia, Jiaxi
    Wang, Jiangfeng
    Lou, Juwei
    Zhao, Pan
    Dai, Yiping
    ENERGY CONVERSION AND MANAGEMENT, 2016, 128 : 303 - 316
  • [32] Evaluation of thermoelectric power generated through waste heat recovery from long ducts and different thermal system configurations
    Elankovan, R.
    Suresh, S.
    Karthick, Krishnadass
    Hussain, Mohammed Muaaz M. D.
    Chandramohan, V. P.
    ENERGY, 2019, 185 : 477 - 491
  • [33] Waste heat recovery power generation (WHRPG) for cement plants
    Ino, T.
    Cement International, 2010, 8 (01): : 36 - 45
  • [34] Waste heat recovery systems and power projects for cement plants
    Atre, Asmita
    Engineered Systems, 2014, 31 (05): : 23 - 24
  • [35] Simulation and optimization of the waste heat recovery system of the ship power system based on the heat current method
    Wei, Zhi-guo
    Qiu, Zhi-qiang
    Xiao, Qi
    Shao, Wei
    ENERGY SCIENCE & ENGINEERING, 2022, 10 (12) : 4566 - 4579
  • [36] Optimization of thermoelectric generator module spacing and spreader thickness used in a waste heat recovery system
    Jang, Jiin-Yuh
    Tsai, Ying-Chi
    APPLIED THERMAL ENGINEERING, 2013, 51 (1-2) : 677 - 689
  • [37] OPTIMIZATION OF WASTE HEAT RECOVERY POWER GENERATION SYSTEM APPLIED IN FERROALLOY INDUSTRY
    Wang, Yufeng
    Zhao, Shuai
    Hui, Shien
    Zhao, Qinxin
    Zhou, Qulan
    PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 2, 2012, : 117 - +
  • [38] Optimization design and economic analyses of heat recovery exchangers on rotary kilns
    Yin, Qian
    Du, Wen-Jing
    Ji, Xing-Lin
    Cheng, Lin
    APPLIED ENERGY, 2016, 180 : 743 - 756
  • [39] Energy audit and waste heat recovery from kiln hot shell surface of a cement plant
    Mittal, Ankur
    Rakshit, Dibakar
    THERMAL SCIENCE AND ENGINEERING PROGRESS, 2020, 19
  • [40] Thermal parameter optimization of waste heat power generation system that used in a float method glass kiln
    Chen, Guanghui
    Cheng, Jinming
    Miao, Changhai
    THERMAL, POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 732-733 : 312 - +