Analysis of reactive scheduling problems in a job shop environment

被引:145
|
作者
Sabuncuoglu, I [1 ]
Bayiz, M
机构
[1] Bilkent Univ, Fac Engn, Dept Ind Engn, TR-06533 Ankara, Turkey
[2] Kiran Consulting Grp, San Diego, CA USA
关键词
reactive scheduling; beam search; job shop scheduling;
D O I
10.1016/S0377-2217(99)00311-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we study the reactive scheduling problems in a stochastic manufacturing environment. Specifically, we test the several scheduling policies under machine breakdowns in a classical job shop system. In addition, we measure the effect of system size and type of work allocation (uniform and bottleneck) on the system performance. The performance of the system is measured for the mean tardiness and makespan criteria. We also investigate a partial scheduling scheme under both deterministic and stochastic environments for several system configurations. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:567 / 586
页数:20
相关论文
共 50 条
  • [21] Job shop scheduling by pheromone approach in a dynamic environment
    Renna, P.
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2010, 23 (05) : 412 - 424
  • [22] Dynamic job shop scheduling in a tool shared environment
    Xu, Z
    Randhawa, S
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) : 197 - 200
  • [23] SLSP - SIMULTANEOUS LOTSIZING AND SCHEDULING IN A JOB SHOP ENVIRONMENT
    Hoeck, M.
    [J]. POLISH JOURNAL OF MANAGEMENT STUDIES, 2010, 1 : 86 - 101
  • [24] Customer order scheduling in a general job shop environment
    Blocher, JD
    Chhajed, D
    Leung, M
    [J]. DECISION SCIENCES, 1998, 29 (04) : 951 - 981
  • [25] Integration of process planning and scheduling in a job shop environment
    Kumar, M
    Rajotia, S
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 28 (1-2): : 109 - 116
  • [26] Integration of process planning and scheduling in a job shop environment
    Manish Kumar
    Sunil Rajotia
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 28 : 109 - 116
  • [27] SCHEDULING FOR MACHINING AND ASSEMBLY IN A JOB-SHOP ENVIRONMENT
    DOCTOR, SR
    CAVALIER, TM
    EGBELU, PJ
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (06) : 1275 - 1297
  • [28] Multi-level job scheduling in a flexible job shop environment
    Na, Hongbum
    Park, Jinwoo
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) : 3877 - 3887
  • [29] An Imperialist Competitive Algorithm for the Job Shop Scheduling Problems
    Piroozfard, H.
    Wong, K. Y.
    [J]. 2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 69 - 73
  • [30] Research on the Model and Solving of Job Shop Scheduling Problems
    Chen Tao
    Gao Liqun
    [J]. MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 2654 - 2658