Probabilistic safety assessment of multi-unit nuclear power plant sites - An integrated approach

被引:18
|
作者
Hassija, Varun [1 ]
Kumar, C. Senthil [2 ]
Velusamy, K. [1 ]
机构
[1] IGCAR, Reactor Design Grp, Kalpakkam 603102, Tamil Nadu, India
[2] AERB Safety Res Inst, Kalpakkam 603102, Tamil Nadu, India
关键词
Multi-unit nuclear site; Site core damage frequency; Multiple core damage; External hazards; Shared systems; RISK-ASSESSMENT; METHODOLOGIES; EVENTS;
D O I
10.1016/j.jlp.2014.07.013
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Multi-unit safety assessment has gained global importance after the Fukushima disaster in 2011. Most of the nuclear sites in the world have more than one reactor and hence it is important to evolve a methodology to systematically assess the safety of the multi-unit site. In this paper, unique features to be addressed in multi-unit safety assessment are discussed and an integrated approach is developed to assess the risk contribution of multiple nuclear plants at the site. The paper highlights the importance of risks for multi-unit sites arising from shared system, common cause failures, failure correlations, cliffedge effects, etc. from different hazards. Though the main emphasis on multi-unit safety is on external hazards, the proposed approach also includes risk from random internal events. The approach developed not only quantifies the frequency of multiple core damage for a multi-unit site but also evaluates site core damage frequency which is the frequency of at least single core damage per site per year. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:52 / 62
页数:11
相关论文
共 50 条
  • [41] PROBABILISTIC SAFETY ASSESSMENT ON UNAVAILABILITY OF AUXILIARY EXTERNAL POWER SUPPLY IN FANGJIASHAN NUCLEAR POWER PLANT
    Zou, Shengjia
    Zhao, Ming
    Liu, Deyi
    Zhang, Naiyuan
    Luo, Yang
    Wang, Li
    Zhang, Jianguo
    Chen, Honghao
    [J]. PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 3, 2021,
  • [42] An approach to estimate SBO risks in multi-unit nuclear power plants with a shared alternate AC power source
    Jung, WS
    Yang, JE
    Ha, JJ
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 2997 - 3002
  • [43] Probabilistic safety analysis for the Brokdorf Nuclear Power Plant
    Hanisch, T
    Wenzel, J
    [J]. ANNUAL MEETING ON NUCLEAR TECHNOLOGY '97, 1997, : 283 - 286
  • [44] NUCLEAR SAFETY ASSESSMENT - AN INTEGRATED APPROACH
    JEFFRIES, JDE
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 43 : 640 - 641
  • [45] Extension of probabilistic seismic hazard analysis to account for the spatial variability of ground motions at a multi-unit nuclear power plant hard-rock site
    Segarra, Jonathan DeJesus
    Bensi, Michelle
    Weaver, Thomas
    Modarres, Mohammad
    [J]. STRUCTURAL SAFETY, 2020, 85
  • [46] The Implementation of Fault Tree Analysis Approaches in Nuclear Power Plant Probabilistic Safety Assessment
    Purba, Julwan Hendry
    Tjahyani, Damianus Toersiwi Sony
    Deswandri
    [J]. 3RD INTERNATIONAL CONFERENCE ON NUCLEAR ENERGY TECHNOLOGIES AND SCIENCES (ICONETS) 2019, 2019, 2180
  • [47] Contribution of human reliability analysis to the results of probabilistic safety assessment of the nuclear power plant
    Cepin, Marko
    Prosek, Andrej
    [J]. ELEKTROTEHNISKI VESTNIK-ELECTROCHEMICAL REVIEW, 2009, 76 (03): : 139 - 144
  • [48] PERFORMANCE AND APPLICATION OF INTERNAL FLOOD PROBABILISTIC SAFETY ASSESSMENT IN NUCLEAR POWER PLANT DESIGN
    Huang, Lihua
    Liu, Xiang
    Wang, Lijuan
    [J]. PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 4, 2017,
  • [49] Fuzzy probability on reliability study of nuclear power plant probabilistic safety assessment: A review
    Purba, Julwan Hendry
    [J]. PROGRESS IN NUCLEAR ENERGY, 2014, 76 : 73 - 80
  • [50] Dependency analysis method for human failure events in multi-unit probabilistic safety assessments
    Arigi, Awwal Mohammed
    Park, Gayoung
    Kim, Jonghyun
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 203