Simulation study on construction process of FRP bridge deck panels

被引:26
|
作者
Hong, Taehoon [1 ]
Hastak, Makarand
机构
[1] Univ Seoul, Dept Architectural Engn, Seoul, South Korea
[2] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
关键词
construction; fiber-reinforced materials; composite materials; productivity; simulation;
D O I
10.1016/j.autcon.2006.10.004
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to further enhance the application of fiber-reinforced composites in infrastructure renewal, it will be important to determine the productivity, man-hour requirements, and system bottlenecks that are important for understanding their construction process. Process modeling and simulation study were used to determine the productivity and cost per hour of installation in both FRP bridge deck panel and partial-depth precast concrete deck construction. The simulated results are applied to an example situation to compare two systems for rehabilitating bridge decks. Based on the simulation study, the productivity of FRP bridge deck panels is approximately four times higher than that of precast concrete decks. However, in comparison with the cost per hour including initial material cost of both systems, the cost per hour of partial-depth precast concrete decks is approximately four times cheaper than that of FRP bridge deck panels. The results show that the FRP bridge deck panels, as of now, are not cost-effective option for rehabilitating highway bridge decks unless it is expected to reduce the higher initial materials costs. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:620 / 631
页数:12
相关论文
共 50 条
  • [21] Selling bridge builders on precast deck panels
    Horstketter, E.A.
    [J]. Concrete Producer, 1997, 15 (05):
  • [22] Testing of fiberglass composite bridge deck panels
    Harik, I
    Alagusundaramoorthy, P
    Siddiqui, R
    Lopez-Anido, R
    Morton, S
    Dutta, P
    Shahrooz, B
    [J]. BOUNDARY ELEMENT TECHNOLOGY XIII: INCORPORATING COMPUTATIONAL METHODS AND TESTING FOR ENGINEERING INTEGRITY, 1999, 2 : 663 - 672
  • [23] Educational Model Based on Virtual Reality Simulation of the Construction of a Bridge Deck
    Sampaio, Alcinia Z.
    Viana, Luis
    [J]. 2013 2ND EXPERIMENT@ INTERNATIONAL CONFERENCE (EXP.AT'13), 2013, : 52 - 57
  • [24] New bridge deck will use FRP form and reinforcement
    不详
    [J]. CIVIL ENGINEERING, 2001, 71 (04): : 33 - 33
  • [25] Optimum design of FRP rib core bridge deck
    Dey, Tushar Kanti
    Srivastava, Ishan
    Khandelwal, Ravi Prakash
    Sharma, Umesh Kumar
    Chakrabarti, Anupam
    [J]. COMPOSITES PART B-ENGINEERING, 2013, 45 (01) : 930 - 938
  • [26] Ohio bridge deck replacement advances use of FRP
    Fortner, B
    [J]. CIVIL ENGINEERING, 2001, 71 (02): : 34 - 34
  • [27] Dynamic Analysis of the Bentley Creek Bridge with FRP Deck
    Hag-Elsafi, Osman
    Albers, William F.
    Alampalli, Sreenivas
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2012, 17 (02) : 318 - 333
  • [28] Flexural behavior of prestressed FRP tubular bridge deck
    Wu, Zhenhua
    Mirmiran, Amir
    Zhu, Zhenyu
    Swanson, James
    [J]. COMPOSITES PART B-ENGINEERING, 2009, 40 (02) : 125 - 133
  • [29] FEA of complex bridge system with FRP composite deck
    Mu, B
    Wu, HC
    Yan, A
    Warnemuende, K
    Fu, GK
    Gibson, RF
    Kim, DW
    [J]. JOURNAL OF COMPOSITES FOR CONSTRUCTION, 2006, 10 (01) : 79 - 86
  • [30] Development of FRP-concrete composite bridge deck
    Cho, Jeong-Rae
    Kim, Yung-Suk
    Cho, Kenhee
    Chin, Won-Jong
    Kim, Sung-Tae
    [J]. IABSE CONFERENCE NEW DELHI, INDIA 2005: ROLE OF STRUCTURAL ENGINEERS TOWARDS REDUCTION OF POVERTY, 2005, : 479 - 486