Comparison of simulation-driven construction operations visualization and 4D CAD

被引:0
|
作者
Kamat, VR [1 ]
Martinez, JC [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Construct Engn & Management Program, Blacksburg, VA 24061 USA
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Several recent research efforts in visualizing construction are rooted in scheduling. They involve linking activity-based construction schedules and 3D CAD models of facilities to describe discretely-evolving construction "product" visualizations called 4D CAD. The focus is on communicating what component(s) are built where and when. The construction processes or operations actually involved in building them are usually implied. Ongoing research at Virginia Tech focuses on designing automated, simulation-driven methods to visualize, in addition to evolving construction products, the operations and processes that are performed in building them. In addition to what is built where and when, the effort is concerned with visualizing who builds it and how by depicting the interaction between involved machines, resources, and materials. This paper expounds the differences in concept, form, and content between 4D CAD and dynamic 3D visualization of operations simulations. An example of a structural steel framing operation is presented to elucidate the comparison.
引用
收藏
页码:1765 / 1770
页数:6
相关论文
共 50 条
  • [21] Application of 4D visualization technology for safety management in metro construction
    Zhou, Y.
    Ding, L. Y.
    Chen, L. J.
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 34 : 25 - 36
  • [22] Research on Application of Construction Model Based on 4D Visualization in Construction of Intelligent Substation
    Ren, Chunguang
    Wang, Yachen
    Xue, Kai
    Zhi, Shenglong
    Chen, Tao
    [J]. 2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [23] CasCADe: A Novel 4D Visualization System for Virtual Construction Planning
    Ivson, Paulo
    Nascimento, Daniel
    Celes, Waldemar
    Barbosa, Simone D. J.
    [J]. IEEE TRANSACTIONS ON VISUALIZATION AND COMPUTER GRAPHICS, 2018, 24 (01) : 687 - 697
  • [24] PARAMETRIC 4D MODELING FOR REAL-TIME VISUALIZATION OF MICROTUNNELING OPERATIONS
    Liang, Xiong
    Lu, Ming
    Zhang, Jian Ping
    [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 1245 - 1251
  • [25] Attitudes to 3D and 4D CAD systems in the Australian construction industry
    Saha, S
    Hardie, M
    Jeary, A
    [J]. SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 1973 - 1977
  • [26] 4D Simulation Research in Construction: A Systematic Mapping Study
    Conrad Boton
    Louis Rivest
    Sylvain Kubicki
    Oussama Ghnaya
    [J]. Archives of Computational Methods in Engineering, 2023, 30 : 2451 - 2472
  • [27] CRITICALITY VISUALIZATION USING 4D SIMULATION FOR MAJOR CAPITAL PROJECTS
    Guevremont, Michel
    Hammad, Amin
    [J]. 2017 WINTER SIMULATION CONFERENCE (WSC), 2017, : 2360 - 2371
  • [28] Integration of Radio-Frequency Identification and 4D CAD in Construction Management
    胡文发
    [J]. Tsinghua Science and Technology, 2008, (S1) : 151 - 157
  • [29] 4D CAD models to support the coordination of construction activities between contractors
    Trebbe, Martijn
    Hartmann, Timo
    Doree, Andre
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 49 : 83 - 91
  • [30] Application of VR Technology linked with 4D CAD System for Construction Project
    Kang, Leen-Seok
    Moon, Hyoun-Seok
    Park, Seo-Young
    Kim, Hyoun-Seong
    Kim, Chang-Hak
    [J]. 2009 INTERNATIONAL CONFERENCE ON NEW TRENDS IN INFORMATION AND SERVICE SCIENCE (NISS 2009), VOLS 1 AND 2, 2009, : 1058 - +