Developing an integrated social, economic, environmental, and technical analysis model for sustainable development using hybrid multi-criteria decision making methods

被引:35
|
作者
Singh, Shweta [1 ]
Upadhyay, Surya Prakash [2 ]
Powar, Satvasheel [1 ,3 ]
机构
[1] Indian Inst Technol Mandi, Sch Engn, Mandi 175005, Himachal Prades, India
[2] Indian Inst Technol Mandi, Sch Humanities & Social Sci, Mandi 175005, Himachal Prades, India
[3] Hogskolan Dalarna, Energy Technol, Sch Technol & Business Studies, S-79188 Falun, Sweden
关键词
Hydropower; Sustainability; Infrastructure development; MCDM; Fuzzy methods; RENEWABLE ENERGY-SOURCES; SITE SELECTION; MCDM METHODS; FUZZY MOORA; AHP; SWARA;
D O I
10.1016/j.apenergy.2021.118235
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Selecting an appropriate location for a large infrastructure project poses difficult situations. It shall satisfy sustainability indicators and establish harmony among multiple goals of multiple stakeholders. In such a situation, Multi-Criteria Decision Making techniques allow assessing qualitative and quantitative attributes, analysing and removing subjective biases and help in arriving at objective decisions. However, a single Multi-Criteria Decision Making technique may not be an effective tool to generate concrete results as there is no validation of the results. By utilising hybrid Multi-Criteria Decision Making methods, one can incorporate, gauge, and assess the range of social, economic, and environmental impacts precisely and achieve an accurate result by validating results by other methods. Therefore, this paper develops a model called as Social, Economic, Environmental and Technical Assessment model. It combines four fuzzy Multi-Criteria Decision Making techniques viz. Fuzzy Stepwise Weighted Assessment Ratio Analysis, Fuzzy Multi-Objective Optimization by Ratio Analysis, Fuzzy Weighted Applied Energy 308 (2022) 118235 Aggregated Sum Product Assessment and Fuzzy Technique for Order of Preference by Similarity to Ideal Solu- tion. This paper utilises the case of hydropower plants in India, how the policy and decision-makers can arrive at the selection of the best location for an infrastructure project. According to the assessment value, Teesta Low Dam IV (Darjeeling, West Bengal) is the preferred hydropower plant for all selected methods. The State could bring social justice, ecological stability; achieve economic benefits and sustainability by appropriating this proposed model in other development fields.
引用
收藏
页数:14
相关论文
共 50 条