Development of cable maintenance robot for cable-stayed bridges

被引:28
|
作者
Luo, Yun [1 ]
Xie, Shaorong
Gong, Zhenbang
Lu, Tiansheng
机构
[1] Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China
[2] Shanghai Jiao Tong Univ, Coll Mech Engn, Shanghai 200030, Peoples R China
关键词
robotics; cable bridges; China;
D O I
10.1108/01439910710749627
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - In order to replace the conventional human maintenance of cable-stayed bridges, a robot is designed and constructed for tasks such as cleaning, painting and rust-detecting. Design/methodology/approach - Adopting a modular approach, two kinds of climbing mechanisms, plus a painting mechanism and a rust-detecting method are designed. Findings - A robot that can climb and maintain the cables of cable-stayed bridges has been designed and constructed. It has been proved by experiment that the robot can overcome many disadvantages of conventional human bridge-maintenance, and drastically improve efficiency, cost, and safety. Research limitations/implications - The robot is of industrial size, but a new mechanism requiring less installing time will be designed for the future. Practical implications - The robot has been applied to cables of the Nanpu Bridge and Xupu Bridge in Shanghai. More than 80 cable-stayed bridges and six suspension bridges have been built or are being constructed across large rivers in China alone. This gives an enormous potential market. Originality/value - The cable maintenance robot developed in this paper is the world's first special robot for the cables of cable-stayed bridges.
引用
收藏
页码:303 / 309
页数:7
相关论文
共 50 条
  • [31] Influence of fatigue on cable arrangement in cable-stayed bridges
    A. Pipinato
    C. Pellegrino
    G. Fregno
    C. Modena
    International Journal of Steel Structures, 2012, 12 : 107 - 123
  • [32] Cable loss and progressive collapse in cable-stayed bridges
    Wolff, Maren
    Starossek, Uwe
    BRIDGE STRUCTURES, 2009, 5 (01) : 17 - 28
  • [33] CABLE TENSIONING IN CABLE-STAYED BRIDGES BY COMBINATION METHOD
    Wang, Wei
    Qu, Wei-Lian
    PROCEEDINGS OF THE TENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING FOR YOUNG EXPERTS, VOLS I AND II, 2008, : 1569 - 1573
  • [34] Development of BIM-based bridge maintenance system for cable-stayed bridges
    Shire, Chang-su
    Kang, Hwirang
    Dang, Ngoc Son
    Lee, Deokkeun
    SMART STRUCTURES AND SYSTEMS, 2017, 20 (06) : 697 - 708
  • [35] Developing a climbing robot for repairing cables of cable-stayed bridges
    Xu, Fengyu
    Dai, Suya
    Jiang, Quansheng
    Wang, Xingsong
    AUTOMATION IN CONSTRUCTION, 2021, 129
  • [36] Vibration control of cable-stayed bridges: Analytical development
    Schemmann, AG
    Smith, HA
    ENGINEERING MECHANICS: PROCEEDINGS OF THE 11TH CONFERENCE, VOLS 1 AND 2, 1996, : 898 - 901
  • [38] Dynamic testing of cable-stayed bridges
    Cases, JR
    STRUCTURAL ENGINEERING IN THE 21ST CENTURY, 1999, : 324 - 327
  • [39] Analysis of cables in cable-stayed bridges
    Santos, I. C.
    Caetano, E. S.
    Brito, J. L. V.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 564 - 564
  • [40] Structural stability of cable-stayed bridges
    Kim, Seungjun
    Won, Deok Hee
    Lee, Keesei
    Kang, Young Jong
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2015, 15 (03) : 743 - 760